Skip to main content

Demanding earthworks on major highway scheme

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 24, 2012 Read time: 1 min
Portuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

For more information on companies in this article

Related Content

  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.
  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.
  • Doosan’s DA40 ADT for rent, Norwegian style
    May 18, 2018
    Hæhre & Isachsen has purchased 20 Doosan DA40 Stage IV/Tier 4 Final compliant articulated dump trucks – the largest Doosan ADT order in Scandinavia. The previous record was also with Hæhre for 10 Doosan ADTs. With the 20 new DA40 ADTs, 51 of Hæhre’s 59 ADTs will be Doosan. Two of the remaining eight are dump trucks in sizes Doosan does not have in its range. Rental business Hæhre & Isachsen Maskinutleie is part of BetonmastHæhre Anlegg - formerly called Hæhre, one of Norway's largest road and civil engine
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.