Skip to main content

D1 days in the Czech republic for a Hitachi ZX300LC-6 excavator

A Hitachi ZX300LC-6 excavator is helping to upgrade a stretch of the D1 highway in the Czech Republic, one of the country’s most important routes. Part of the E50/E65 European road network, the D1 is the main highway between Prague and Brno, the largest cities in the Czech Republic. As part of a broader governmental initiative that started three years ago, work began on a specific 68km stretch of the D1 in February 2017.
December 18, 2017 Read time: 2 mins
A new highway will link the Czech Republic's capital Prague with the second city, Brno
A 233 Hitachi ZX300LC-6 excavator is helping to upgrade a stretch of the D1 highway in the Czech Republic, one of the country’s most important routes.


Part of the E50/E65 European road network, the D1 is the main highway between Prague and Brno, the largest cities in the Czech Republic. As part of a broader governmental initiative that started three years ago, work began on a specific 68km stretch of the D1 in February 2017.

ATM CZ is widening the entire section from two to three lanes, with the ZX300LC-6 medium excavator being used for earthmoving and grading. The project is taking place near the town of Zruč nad Sázavou, to the south-east of Prague.

The Zaxis-6 machine was delivered in September 2016 to ATM, a contractor specialising in road construction, soil stabilisation and demolition projects. The machine benefits from a six-cylinder engine to increase productivity, while the TRIAS II hydraulic system reduces hydraulic loss and increases efficiency. In addition, the machine’s user-friendly routine maintenance points and durable components have contributed to its reliability on site, according to ATM’s production manager Frantisek Tvrdy.

For more information on companies in this article

Related Content

  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.
  • D8 highway in Czech Republic delayed
    September 19, 2013
    Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the ro
  • Delays plague Slovakia’s D1 motorway work
    May 12, 2017
    Slovakia is reporting delays to works on the D1 motor, the country’s major east-west corridor and part of several pan-European routes, including the E50. The planned 2020 completion of the D1 motorway linking Bratislava - Kosice could be 2021. There are reported technical complications to the section between Lietavska Lucka - Dubna Skala stretch with the Visnove tunnel near Zilina is experiencing complications. Work by the consortium of OHL and Vahostav on the D1 stretch Hubova – Ivachvova is suspended due
  • Hitachi rolls out new excavators at bauma China
    November 27, 2014
    Hitachi has unveiled a new range of hydraulic excavators at bauma China 2014. High performance, productivity and durability are claimed. The models on show range from the powerful 69tonne ZX690LCH-5A to the 16.8tonne ZX170LC-5A.