Skip to main content

Construction equipment sells well in China

Century deal for Volvo CE Volvo Construction Equipment sold 100 heavy excavators to mining, highway and real estate company Tang Sunrise Investment during its sales promotion in the Chinese city of Fuquing.
February 23, 2012 Read time: 2 mins
Les Taylor Contractors has added a new Volvo EC240C excavator to its piling division
2394 Volvo Construction Equipment sold 100 heavy excavators to mining, highway and real estate company Tang Sunrise Investment during its sales promotion in the Chinese city of Fuquing.

The deal, which was one of over 250 machines sold during the event, adds to Tang Sunrise's Volvo fleet of 17 large excavators, including two flagship 70tonne class EC700 BLC.

Tang Sunrise's 100-machine deal includes 75 Volvo 36tonne EC360BLC; 15 of the larger 46tonne EC460BLC, and ten units of the 29tonne class EC290BLC.

Mr Tang said he was impressed with the strong digging force, high fuel efficiency, good service support and easy troubleshooting of the Volvo products.

Meanwhile, 1601 Les Taylor Contractors of Mintlaw, near Peterhead, Aberdeenshire, Scotland, has added a new Volvo EC240C excavator to its piling division and equipped it with its own design of piling head for contracts nationwide.

The Les Taylor Group of Companies specialises in quarry resources, logistics, demolition and plant hire, and waste recycling in north-east Scotland and piling contracts nationwide.

The 2tonne head runs off the EC240C's hammer shear circuit requiring up to 230litres/min in high mode and it can handle sheet pile sections up to 14m long at a reach of 7m.

The EC240C is powered by a 7litre Volvo Tier III low emission engine and is equipped with the standard 6m boom and 2.97m dipper arm. In this configuration the maximum ground reach is 10.26m and the load over height is 6.8m.

For more information on companies in this article

Related Content

  • High mobility digging
    July 16, 2012
    Gradall Industries continues to develop its mobile excavators with the launch of the new XL4100III model. Highly mobile, the XL410III can be driven to job sites without the cost for a truck and lowboy trailer. Power comes from a fuel-efficient Detroit Diesel Mercedes engine that meets Tier 3 noise and emissions legislation. The machine is able to work in tighter spaces than its predecessor as its tail-swing is 305mm shorter. The carrier is offered in either 6x4 or 6x6 configurations, which weigh in a 21.5to
  • New Zaxis machines for Keyway
    November 30, 2012
    A customer of HM Plant, the official UK dealer for Hitachi Construction Machinery (Europe), has invested in 68 new Zaxis excavators so far in 2012. Gloucester-based Keyway took delivery of 34 of the new models, ranging from one to 21tonnes, between March and April. The remainder will be delivered over the next few months. The sizeable but undisclosed investment takes the total number of Hitachi machines in the Keyworth fleet to 120. A family-run enterprise, established by Eamonn McGurk in 1966, Keyworth spe
  • New excavators dig more efficiently
    March 18, 2016
    Increased performance and more durable construction are key features of new generation excavators – Mike Woof writes. All the major equipment manufacturers are introducing new hydraulic excavators to meet market demand. These machines are offering increased output at the same time as producing lower emission levels and burning less fuel than before. From Caterpillar for instance comes its new 330F, which features a maximum operating weight of 29.75tonnes and is powered by a 178kW Cat C7.1 ACERT diesel that
  • Effective, efficient long reach excavators
    April 13, 2012
    Long reach excavators now dominate the demolition sector - Mike Woof reports The last 10-15 years have seen the way demolition work is carried out change dramatically. Safety issues have long been of concern in the demolition sector, with the industry having been criticised for not doing enough to protect its workforce. Demolition projects can be dangerous due to the very nature of the job, with old structures being knocked down and broken up on-site. There is a substantial risk to site workers from