Skip to main content

Chinese extraction site using XCMG machines

An extraction operation in China is benefiting from the use of construction machines supplied by XCMG. The site, in Xinjiang, has been using XCMG XE470D and XE700D excavators since 2016. The machines have now clocked in excess of 10,000 operating hours, with operators working in shifts allowing the excavators to operate 20 hours/day. The site is located at the northern edge of the Tianshan Mountains and the south-eastern edge of the Junggar Basin. It is affected by the Indosinian and Yanshan movements, w
May 22, 2019 Read time: 2 mins
Despite tough working conditions, the XCMG excavators used at the extraction site in China have been able to top 10,000 operating hours
An extraction operation in China is benefiting from the use of construction machines supplied by 2490 XCMG. The site, in Xinjiang, has been using XCMG XE470D and XE700D excavators since 2016. The machines have now clocked in excess of 10,000 operating hours, with operators working in shifts allowing the excavators to operate 20 hours/day.


The site is located at the northern edge of the Tianshan Mountains and the south-eastern edge of the Junggar Basin. It is affected by the Indosinian and Yanshan movements, where the geological folds are intense and the terrain is complex. The difficult geology adds to the challenges the machines face at the site, where the environment is difficult with hard digging conditions and a high incidence of dust.

Despite the demanding conditions however, the machines are still delivering high utilisation rates and are working reliably. Planned maintenance schedules have ensured that the excavators have been able to operate in the difficult conditions, despite the long working hours.

For more information on companies in this article

Related Content

  • UAE quarry facility boosting productivity
    May 15, 2015
    A United Arab Emirates quarry is putting its Volvo fleet to the test in harsh conditions A quarrying facility in the United Arab Emirates (UAE), is boosting output following the commissioning of a new machine fleet for loading and hauling duties. The quarry is located in the northeast of the UAE in Fujairah, an emirate almost entirely surrounded by mountains. This rugged landscape is the product of an estimated 800 million years of geological activity and is the source of a high quality limestone used in
  • Tunnelling project under Micang Mountain
    October 15, 2018
    Equipment from XCMG has played an important role in the excavation of a new tunnel link underneath the Micang Mountain in China. The project to build the right-hand bore for the Micang Mountain tunnel on the Sichuan-Shaanxi Expressway has taken 54 months to complete. The tunnel was needed as the Micang Mountain has been a barrier to direct transportation at the junction of Hanzhong and Bazhong. This has blocked the major transport route between Sichuan and Shaanxi, preventing traffic flows across the reg
  • XCMG provides rescue capabilities to Chinese earthquake area
    January 5, 2015
    Within 24 hours after the 6.5 magnitude earthquake, XCMG was hard at work on site XCMG recently provided a fast emergency response to an earthquake-stricken area of China. The firm’s rescue team rushed to provide help following the 6.5-magnitude earthquake which hit Ludian County in Yunnan Province. Rescuers reported 398 deaths, 1,801 injured, and in excess of 10,000 buildings having collapsed.
  • Tunnels and bridges, improving Argentina's major road link
    May 2, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock