Skip to main content

Caterpillar drill performing in US quarry

A Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US. The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines. Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier gener
May 11, 2015 Read time: 2 mins
Caterpillar MD5150C Top Hammer Drill working at Tower Rock
A 178 Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US.

The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines.

Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier generation DTH drill the operation already has onsite. Key features of the machine’s productivity include the efficient Cat HPR6832 hydraulic rock drill, the new carousel rod changer and the efficient Cat C11 Engine.

While penetration rates are high, the cost/m drilled are also said to be low, which is helping Iron Mountain deliver good cost efficiency. The rig is used to drill 140mm diameter holes to depths of 21.33m, using 68mm diameter drill rods. The bits can last 335-366m, which is the same consumption rate as the previous DTH rig. Fuel consumption and drill road wear, on the other hand, is lower than for the DTH drill. According to Caterpillar, owning and operating cost are lower while the simple rock drill design allows it to be serviced in the field.

Earlier trials at a Tower Rock limestone quarry near St Genevieve, Missouri showed similar good performance for the Cat drill.  The site has softer rock conditions and the MD5150C outpaced a DTH drill. Austin Powder carried out a bore tracking test, while the results showed a hole deviation rate with the MD5150C rig was within the desired range. This last is of note as while tophammer rigs are known for their productivity, DTH machines are known for hole straightness. Achieving good hole straightness with a tophammer machine is of note. This point is crucial for efficient blasting and deviation of blastholes reduces blasting efficiency and results in greater percentages of fines that go to waste or oversized material that requires secondary breaking, further adding to quarrying costs.

For more information on companies in this article

Related Content

  • Rare Indian red granite extracted from village quarries
    June 25, 2013
    Rare Indian red granite is being extracted from four granite quarries across 24hectares of land in the south Indian villages of Purthagere and Kadur According to legend, Ilkal granite (also known as Cat’s Eye granite) was first discovered 2,000 years ago, but remained a little known rarity for two millennia. This all changed in 1983 when rich deposits were discovered in a small corner of south-west India, allowing Ilkal granite to be exploited for its beauty and decorative worth.
  • Caterpillar goes big today on future technologies
    March 6, 2017
    Caterpillar has stressed how the use of innovative data analysis hardware and software can boost construction, mining and quarrying jobsite productivity by up to 40%. The US equipment giant says it is leading the industry by introducing the best products and technology, while also delivering a full portfolio of solutions.
  • Efficient aggregate production technology
    July 13, 2020
    Efficient aggregate production technology is now coming to market, offering lower cost/tonne production
  • Bang: big bridge blocking boulder broken by blasting
    April 24, 2013
    Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol