Skip to main content

Cat machines on Russian summit site

The summit of APEC (Asia-Pacific Economic Cooperation) taking place on Russky Island, close to Vladivostok, Russia, in 2012 has prompted a myriad of construction projects in the area. The massive construction site includes hotels and a conference centre, airport reconstruction, highway construction and reconstruction, an opera and ballet theatre, sea facade including port structures and infrastructure, and the Eastern Bosphorus Strait Bridge (see World report, World Highways November/December 2009), which w
February 7, 2012 Read time: 2 mins
Crocus ZAO's Caterpillar machines are helping to lay the groundwork for the APEC summit facilities at Russky Island, Vladivostock, site of a myriad of construction projects.
The summit of APEC (2868 Asia-Pacific Economic Cooperation) taking place on Russky Island, close to Vladivostok, Russia, in 2012 has prompted a myriad of construction projects in the area.

The massive construction site includes hotels and a conference centre, airport reconstruction, highway construction and reconstruction, an opera and ballet theatre, sea facade including port structures and infrastructure, and the Eastern Bosphorus Strait Bridge (see World report, World Highways November/December 2009), which will link the continent to the island. The bridge will be the world's largest cable-stayed bridge when completed.

The works are under way and scheduled to finish by the end of 2011, and several 178 Caterpillar machines are clocking up hours as part of the project.

In 2009, the local Cat dealer Amur Machinery supplied 12 Cat machines and rented ten additional units to Crocus ZAO, the general contractor laying the groundwork for the summit's facilities.

In February this year, another 17 machines were purchased: four 428E backhoe loaders, a D5NXL, a D6T, a D7G and two D6NXL and two D9R track-type tractors, three CS56 vibratory soil compactors as well as a 320DL, a 325DL and a 330DL hydraulic excavator. Cat Financial funded the entire mix of track type-tractors and excavators.

Crocus ZAO was nominated as the general contractor to fulfil the US$2.5 billion contract in early 2009.

Caterpillar CIS industry sales manager Robert Thiel, said of participation in the construction works: "This project is unique due to the large construction volume in the very limited timeframe. Reliable Cat machines together with world-class product support from Amur Machinery and attractive finance terms from Caterpillar Financial were major drivers for the project. We are proud to be part of this major infrastructure project in Russia." The APEC forum includes 21 member economies that are home to more than 2.7 billion people and represent approximately 55% of world GDP and 49% of world trade.

For more information on companies in this article

Related Content

  • A new tunnel project for Turkey is a significant move
    December 12, 2012
    The European Bank for Reconstruction and Development (EBRD) is supplying a finance package worth US$150 million for the new Bosphorus crossing project in Turkey. Running under the Bosphorus at Istanbul, the new tunnel will connect both European and Asian sides of the city. The EBRD’s $150 million loan completes $1.4 billion worth of financing required for the Eurasia Tunnel project, being built under the Bosphorus straits. Other components of the $1.4 billion financing package for this PPP project include a
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Finning's European first for Cat
    February 17, 2012
    Caterpillar's UK dealer Finning UK has completed the first Cat Certified Hydraulic Rebuild (CHR) in Europe. mWhile rebuild of a machine or a powertrain is an option that many Cat dealers worldwide have been offering for years under the Cat Certified Rebuild (CCR) and the Cat Certified Powertrain (CPT) programmes, following the same idea of rebuild, Finning carried out a hydraulic system overhaul for customer Westminster Dredging.
  • German government to adhere to Fehmarn Belt tunnel plans
    April 30, 2015
    Germany is to adhere to plans for a tunnel between Fehmarn, Germany, and Lolland, Denmark despite criticism over the cost and a delayed schedule. Denmark alone is likely to foot the €7.4 billion bill for the prestigious Fehmarn Belt Fixed Link immersed tunnel while Germany will pay for only access roads and other connections on its territory. Angela Merkel, Chancellor of Germany, said her government and transport authorities will respond to more than 3,000 objections over the construction of the tunne