Skip to main content

Cat machines on Russian summit site

The summit of APEC (Asia-Pacific Economic Cooperation) taking place on Russky Island, close to Vladivostok, Russia, in 2012 has prompted a myriad of construction projects in the area. The massive construction site includes hotels and a conference centre, airport reconstruction, highway construction and reconstruction, an opera and ballet theatre, sea facade including port structures and infrastructure, and the Eastern Bosphorus Strait Bridge (see World report, World Highways November/December 2009), which w
February 7, 2012 Read time: 2 mins
Crocus ZAO's Caterpillar machines are helping to lay the groundwork for the APEC summit facilities at Russky Island, Vladivostock, site of a myriad of construction projects.
The summit of APEC (2868 Asia-Pacific Economic Cooperation) taking place on Russky Island, close to Vladivostok, Russia, in 2012 has prompted a myriad of construction projects in the area.

The massive construction site includes hotels and a conference centre, airport reconstruction, highway construction and reconstruction, an opera and ballet theatre, sea facade including port structures and infrastructure, and the Eastern Bosphorus Strait Bridge (see World report, World Highways November/December 2009), which will link the continent to the island. The bridge will be the world's largest cable-stayed bridge when completed.

The works are under way and scheduled to finish by the end of 2011, and several 178 Caterpillar machines are clocking up hours as part of the project.

In 2009, the local Cat dealer Amur Machinery supplied 12 Cat machines and rented ten additional units to Crocus ZAO, the general contractor laying the groundwork for the summit's facilities.

In February this year, another 17 machines were purchased: four 428E backhoe loaders, a D5NXL, a D6T, a D7G and two D6NXL and two D9R track-type tractors, three CS56 vibratory soil compactors as well as a 320DL, a 325DL and a 330DL hydraulic excavator. Cat Financial funded the entire mix of track type-tractors and excavators.

Crocus ZAO was nominated as the general contractor to fulfil the US$2.5 billion contract in early 2009.

Caterpillar CIS industry sales manager Robert Thiel, said of participation in the construction works: "This project is unique due to the large construction volume in the very limited timeframe. Reliable Cat machines together with world-class product support from Amur Machinery and attractive finance terms from Caterpillar Financial were major drivers for the project. We are proud to be part of this major infrastructure project in Russia." The APEC forum includes 21 member economies that are home to more than 2.7 billion people and represent approximately 55% of world GDP and 49% of world trade.

For more information on companies in this article

Related Content

  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l
  • Construction equipment launched at Bauma China
    February 15, 2012
    The 2010 bauma China event did, as expected, break all previous records, with companies launching more new equipment than ever. Patrick Smith reports. The queues at the entrances on the first day of bauma China 2010 indicated what the rest of the week had in store. As thousands of visitors poured through the gates each day to view the latest in construction equipment at the expanded Shanghai New International Expo Centre, the organisers knew they were looking at another successful event.
  • VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders
    May 23, 2016
    Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

    The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.