Skip to main content

Atlas Copco launches new Chinese drill rig

Atlas Copco launched its new PowerROC T50 drill rig at bauma China 2014, in Shanghai. It was designed and is now built at Atlas Copco's Nanjing China facility but aimed very much at global market needs. York Yang, product manager in Nanjing joked, “We should design a product to drill holes in the customer's ground not the customer's pocket.” And with cost effectiveness in mind the T50 was developed.
November 27, 2014 Read time: 2 mins
The new PowerROC T50 rig from Atlas Copco offers high performance, while being cost effective

161 Atlas Copco launched its new PowerROC T50 drill rig at bauma China 2014, in Shanghai. It was designed and is now built at Atlas Copco's Nanjing China facility but aimed very much at global market needs. York Yang, product manager in Nanjing joked, “We should design a product to drill holes in the customer's ground not the customer's pocket.” And with cost effectiveness in mind the T50 was developed.

There are three key components: a rock drill delivering 30kW for fast penetration, robust boom, and engine choices for different emissions requirements. The rig comes equipped with the COP 3060 hydraulic rock drill. A high feed force can be applied while ensuring holes are straight due to the newly designed extension boom. It provides easy positioning and has a robust aluminium chain-feed. There is choice of engine between a 9litre Tier 3 unit or a 9.3litre Tier 4 unit, both of which deliver 261kW.

The T50 drills holes in the 102-152mm range. Feed extension is 1.9m with a total length of 9.37m and travel length of 5.4m. Both feed rate and feed force are 50kN. It is equipped with a 20m2 filter area with a maximum cleaning air pressure of 8 bar.

“The market is looking for machines with real power, robust, easy to operate, environmentally friendly and that can deliver fuel savings,” said Goran Popski, marketing manager. It seems Atlas Copco has managed this. The rig was tested in mines in China, the USA and South Africa. Eire Contractors, the test client in South Africa, has already placed an order for five machines.

For more information on companies in this article

Related Content

  • Engine manufacturers meeting emissions deadlines
    February 10, 2012
    Engine manufacturers have had to jump through regulatory hoops in recent years, meeting requirements for diesels with ever cleaner exhaust emissions. When this programme was first proposed, many believed the final aims could not be achieved. However on January 1st 2011, the Tier 4 Interim/Stage IIIB emissions regulations will come into force in North America and Europe and all the major diesel manufacturers will have suitable products at the ready. The Tier 4 Interim/Stage IIIB emissions regulations require
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
  • Manitowoc launches new MLC165 crawler crane in the U.S. at Conexpo 2014
    January 6, 2017
    Manitowoc will launch its 165tonne MLC165 lattice-boom crawler crane on to the U.S. market during Conexpo 2014. The MLV165 will be joined by two completely new crawler cranes – with Manitowoc keeping their details under wraps until the show.Designed for the global market, the MLC165 was first shown at the bauma 2013 exhibition in Munich, Germany.
  • High mobility for Sennebogen’s new crane
    April 10, 2018
    Sennebogen says that its new 670 HD crane offers a maximum 70tonne lift capacity as well as ease of transport and versatility. The heavy duty crane features a lattice boom and is part of the firm’s E-series, having been designed for use in demanding applications and with a wide variety of equipment. Customers have a choice of three engine variants, a 298kW Tier 3/Stage IIIa version and either 261kW or 321kW diesels that meet Tier 4 Final/Stage IV requirements. According to Sennebogen, the machine can be us