Skip to main content

Atlas Copco launches new Chinese drill rig

Atlas Copco launched its new PowerROC T50 drill rig at bauma China 2014, in Shanghai. It was designed and is now built at Atlas Copco's Nanjing China facility but aimed very much at global market needs. York Yang, product manager in Nanjing joked, “We should design a product to drill holes in the customer's ground not the customer's pocket.” And with cost effectiveness in mind the T50 was developed.
January 6, 2017 Read time: 2 mins
The new PowerROC T50 rig from Atlas Copco offers high performance, while being cost effective

161 Atlas Copco launched its new PowerROC T50 drill rig at bauma China 2014, in Shanghai. It was designed and is now built at Atlas Copco's Nanjing China facility but aimed very much at global market needs. York Yang, product manager in Nanjing joked, “We should design a product to drill holes in the customer's ground not the customer's pocket.” And with cost effectiveness in mind the T50 was developed.

There are three key components: a rock drill delivering 30kW for fast penetration, robust boom, and engine choices for different emissions requirements. The rig comes equipped with the COP 3060 hydraulic rock drill. A high feed force can be applied while ensuring holes are straight due to the newly designed extension boom. It provides easy positioning and has a robust aluminium chain-feed. There is choice of engine between a 9litre Tier 3 unit or a 9.3litre Tier 4 unit, both of which deliver 261kW.

The T50 drills holes in the 102-152mm range. Feed extension is 1.9m with a total length of 9.37m and travel length of 5.4m. Both feed rate and feed force are 50kN. It is equipped with a 20m2 filter area with a maximum cleaning air pressure of 8 bar.

“The market is looking for machines with real power, robust, easy to operate, environmentally friendly and that can deliver fuel savings,” said Goran Popski, marketing manager. It seems Atlas Copco has managed this. The rig was tested in mines in China, the USA and South Africa. Eire Contractors, the test client in South Africa, has already placed an order for five machines.

For more information on companies in this article

Related Content

  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.

  • Ammann’s compact and productive soil compactor
    February 8, 2023
    Ammann is introducing its compact and productive ARS 30 and ARS 50 soil compactors to the North American market. The firm says that the new ARS 30 and ARS 50 single drum rollers benefit from advanced technology, innovative engineering and robust engines to deliver high compaction output.
  • New developments in asphalt compaction
    June 14, 2019
    New developments in asphalt compaction offer performance gains for contractors, with future innovations being unveiled – Mike Woof writes Advanced asphalt compactors are offering huge gains in performance over previous generation machines. Better working quality and finish is claimed for the latest machines, while future developments will offer sophisticated solutions. The new ARX 91 articulated tandem roller from Ammann is designed as a high productivity compactor that can be used on both thin and t
  • Qatar tunnel project benefits from sophisticated formwork
    March 7, 2018
    A sophisticated formwork solution has played an important part in the construction of a new road and rail tunnel in Qatar in the Middle East. The formwork system was supplied by ULMA, which supplied its equipment for the construction of the Lusail Boulevard Tunnel in Qatar. The new tunnel provides access to the new Lusail City Development, from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament. The overall Lusail City Development, located 15km north of Do