Skip to main content

Volvo CE’s arduous Andes assignment

Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
August 20, 2013 Read time: 4 mins
A 60-strong fleet of Volvo CE road-building machines is being used to construct a 140km highway across the Andes Mountains in Colombia
Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains.

A fleet of 60 Volvo Construction Equipment (359 Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highway contractor MHC, a company with a long track record of overcoming huge civil engineering challenges – often in extremely hazardous conditions.

These dangers are not restricted to working in the mountainous terrain that is typical of Colombia’s topography, but also in areas where the country’s guerrilla groups are active. But neither peril has held the company back. Now into its fourth generation of family members, MHC has become one of the preeminent highway contractors in Colombia, with over 900 employees and US$600 million of contracts – and Volvo CE has been with them along the way.

MHC’s president Mario Huertas Cotes has been a supporter of Volvo CE since he first purchased six second-hand Volvo 861 haulers in 1982. Even though some may say they should now be museum pieces, these same machines from the 1970s are still working and have logged more than 60,000 hours. “We never get rid of equipment in Colombia,” said Huertas jokingly. “The trick is knowing where best to deploy machines as they age.”

As well as possessing a shrewd attitude to handling equipment, the firm is also adept at handling the sensitive issue of working in remote and potentially dangerous parts of the country. “Building in a conflict zone is not so difficult,” said Huertas defiantly. “You don’t beat these people [guerrilla groups] with bullets, but by providing better social conditions. The areas of Colombia where we operate are often poor, and we provide much-needed jobs and incomes, as well as buying local resources. We are regarded by the guerrillas as helping the people and are left alone.”

With the security situation in Colombia now much improved, the $400 million Andes highway project is just one of the many new construction contracts up for grabs – although it is certainly one of the most ambitious. The existing road between Bacaramanga and Cucuta is narrow, single-tracked, steep and extremely slow-going, with average speeds of only 20km per hour. But when completed, speeds will rise to as much as 80km per hour.

As if building 140km of highway weren’t challenging enough, altitudes range from 900m above sea level up to 3,600m. The steepness of the road will need to be reduced to a maximum incline of 7.5% (currently it is up to 18%) and the road levelled out. This will shorten the present route by 20km – and reduce travel times from Bucaramanga to Cucuta from today’s six hours to just two-and-a-half hours.

MHC has taken full responsibility for the design and construction management of the highway, including all bridges and tunnels – a job made harder by the need to keep the existing road open throughout the build. Several of the bridges are long span – four are over 120m, while one is 640m with columns 80m high, making it one of the tallest in the country. The remaining eight bridges range from 40 to 100m in length – there are also over 1,000m of tunnels being constructed. At its peak MHC will have up to 1,700 people working at the site (there are currently 400).  More than 350,000m³ of earth has to be moved per kilometre of road, making this an enormous earthmoving project. Stabilising the steep slopes of the road is also crucial, especially so in Colombia’s rainy climate where landslides are commonplace. These same slopes put heavy demands on the transmissions of construction equipment, and the high altitude requires adjustment in the treatment of the biodiesel (the use of biodiesel is a must for government p
rojects). Fortunately, all MHC’s newer Volvos are protected by customer support agreements that require local Volvo dealer Chaneme to provide preventative maintenance, consumables and repairs, all conducted on site.

Huertas has managed his family company through some of the most difficult times in Colombia’s modern history. Now with a full order book and his 28-year-old son, Esteban, working as managing director for the Bucaramanga-Cucuta project, the company is moving into its eighth decade and fourth generation with great optimism.

Related Content

  • FCC heads group that will build Toyo Tunnel in Colombia
    November 6, 2015
    Spanish environmental services, infrastructure and water group FCC has secured a €392 deal to design, build, operate and maintain the 10km Toyo Tunnel in Urabá Port, Colombia. The Government of Antioquia awarded the project to the consortium in which Madrid-based FCC has a 40% share and a group of local business people hold 60%. The tunnel is around 80km from Medellin, the capital of Colombia’s mountainous Antioquia province. The US$426 million contract is for 10 years, during which design and constru
  • Volvo CE is looking to the future for construction machines
    September 12, 2018
    Volvo CE is taking bold steps in developing technologies for the future of construction machines – Mike Woof writes Volvo CE is making serious innovations in construction machine technology, developing equipment that is smarter, safer, cleaner and more fuel-efficient. This innovation comes from a position of strength and from a financial perspective, Volvo CE is performing well. CEO Melker Jernberg said, “When it comes to performance we need to be good economically. We saw growth for 2018 in all region
  • Australia’s new airport in Queensland
    August 18, 2015
    The first new airport constructed in Australia for 45 years is now open for business. The Brisbane West Wellcamp Airport in Queensland is located 17km to the west of Toowomba. The facility was completed at the end of last year by Wagners, an Australian family-owned construction company. Toowoomba lies in the Darling Downs region of Queensland, located 126km west of Queensland’s capital city, Brisbane. Toowoomba’s population of approximately 165,000 makes it Australia’s second-most populous inland city. T
  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the