Skip to main content

Volvo CE machines working in a tough climate in Canada

A fleet of construction machines is working in a very tough climate in Canada, helping to keep an important road link open. Tsetsaut Ventures, a local contracting company, is using its fleet of Volvo CE equipment to maintain an 11km ice road that runs over the Knipple Glacier in the remote North Western region of British Columbia. The ice highway allows for the transportation of supplies and materials to a remote underground extraction operation, located in the Golden Triangle, an area known for its abunda
May 22, 2018 Read time: 2 mins
Volvo CE machines working in a tough climate in Canada
A fleet of construction machines is working in a very tough climate in Canada, helping to keep an important road link open. Tsetsaut Ventures, a local contracting company, is using its fleet of 359 Volvo CE equipment to maintain an 11km ice road that runs over the Knipple Glacier in the remote North Western region of British Columbia.


The ice highway allows for the transportation of supplies and materials to a remote underground extraction operation, located in the Golden Triangle, an area known for its abundance of high-grade gold.

The year-round job involves the grading and grooming of the access road, as well as filling crevasses. Tsetsaut also provides the mine with machines, peripheral personnel and manages work camps.

But working on ice is difficult. With up to 30m of snow/year, the glacier is continually moving, freezing and thawing. As the day warms up, the glacier erodes, causing creeks to form in the centre of the access road, which expand into small rivers that must be diverted into drainage ditches. These need daily maintenance and the operator must fill and seal cracks while being careful not to remove too much ice.

Tsetsaut decided to invest in durable machines. The company uses a fleet of Volvo CE machines, including three excavators, five wheeled loaders and nine articulated haulers. The equipment is used to load and unload freight, haul material over the glacier, load and unload earth for the construction of the mine and remove snow from the access road and mine. These have been supplied by Volvo CE dealer Great West Equipment of Terrace, British Columbia.

Equipped with protected components and a robust undercarriage, the EC220E and EC350E excavators are able to work in the tough terrain and extreme conditions.

The 10 haulers load up at night and drive in convoy over the glacier to the mine in the morning. They reload at the mine and then make the return trip. The distance across the ice from load to unload is 10km and a one-way run takes an hour. Operators make an average of three or four trips/working day.

Related Content

  • Tackling Florida’s highway congestion
    August 5, 2016
    Congestion is a major problem in certain areas of US state Florida. Large number of commuters and tourists means that central Florida’s Interstate 4 (I-4) highway suffers particularly from congestion. Its proximity to Disneyland means that the traffic often comes to a complete standstill. A 2012 report from the Texas Transportation Institute ranked Orlando 13th in the US for traffic congestion, with more than 1.5 million daily trips on I-4. The report estimates that each frustrated commuter wastes about 45
  • Volvo CE now offering rigid truck range
    January 11, 2018
    Volvo CE is now offering its own range of rigid haul trucks. There are four machines in the range from the 40tonne class R45D up to the top of the range R100E for the 90tonne class. The trucks have been developed with the assistance of in-house expertise at the Terex Trucks facility in Motherwell, Scotland, which Volvo CE now owns. The range is being launched initially in less regulated markets and comprises the R45D, R60D, R70D and R100E. The R60D and R70D are for the 54tonne and 65tonne payload classes
  • Volvo CE machines in the heat of Qatar
    May 14, 2018
    Construction machines from Volvo CE are helping to build a city in the desert in Qatar. The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving
  • Volvo CE machines help construct and pave Polish highway
    December 17, 2013
    Polish contractors Salini Poland and PBDiM Kobylarnia are building a 64km section of the A1 highway between Toru (Northwest of Warsaw) and Kowale (just south of Gdansk on the Northern coast). This project will complete a key section of the highway and is being funded by the Polish road authority (GDDKiA). Worth some €107 million this is one of three schemes being undertaken by the consortium to complete the main A1 highway.