Skip to main content

Volvo CE machines working in a tough climate in Canada

A fleet of construction machines is working in a very tough climate in Canada, helping to keep an important road link open. Tsetsaut Ventures, a local contracting company, is using its fleet of Volvo CE equipment to maintain an 11km ice road that runs over the Knipple Glacier in the remote North Western region of British Columbia. The ice highway allows for the transportation of supplies and materials to a remote underground extraction operation, located in the Golden Triangle, an area known for its abunda
May 22, 2018 Read time: 2 mins
Volvo CE machines working in a tough climate in Canada
A fleet of construction machines is working in a very tough climate in Canada, helping to keep an important road link open. Tsetsaut Ventures, a local contracting company, is using its fleet of 359 Volvo CE equipment to maintain an 11km ice road that runs over the Knipple Glacier in the remote North Western region of British Columbia.


The ice highway allows for the transportation of supplies and materials to a remote underground extraction operation, located in the Golden Triangle, an area known for its abundance of high-grade gold.

The year-round job involves the grading and grooming of the access road, as well as filling crevasses. Tsetsaut also provides the mine with machines, peripheral personnel and manages work camps.

But working on ice is difficult. With up to 30m of snow/year, the glacier is continually moving, freezing and thawing. As the day warms up, the glacier erodes, causing creeks to form in the centre of the access road, which expand into small rivers that must be diverted into drainage ditches. These need daily maintenance and the operator must fill and seal cracks while being careful not to remove too much ice.

Tsetsaut decided to invest in durable machines. The company uses a fleet of Volvo CE machines, including three excavators, five wheeled loaders and nine articulated haulers. The equipment is used to load and unload freight, haul material over the glacier, load and unload earth for the construction of the mine and remove snow from the access road and mine. These have been supplied by Volvo CE dealer Great West Equipment of Terrace, British Columbia.

Equipped with protected components and a robust undercarriage, the EC220E and EC350E excavators are able to work in the tough terrain and extreme conditions.

The 10 haulers load up at night and drive in convoy over the glacier to the mine in the morning. They reload at the mine and then make the return trip. The distance across the ice from load to unload is 10km and a one-way run takes an hour. Operators make an average of three or four trips/working day.

Related Content

  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Ground control to mining truck offers efficiency gains
    June 19, 2015
    Autonomous and remote control machines are not about to take over the world, but they can provide efficiency gains and savings in some operations – Colin Sowman writes The thought of autonomous machines may conjure up visions of an Orwellian future where society works for the ‘common good’ defined by an all-powerful being and in which people are insignificant in terms of their needs, aspirations and physical wellbeing; of machines that relentlessly carry out their task regardless of anybody or anything that
  • Volvo CE excavators at high altitude in Georgia
    September 4, 2019
    The machines have been used at high altitude, yet have delivered high utilisation despite the tough working conditions.
  • Terex trucks make epic tough trek
    June 21, 2016
    A fleet of 29 Terex Trucks recently made a journey of 20,800km by road, river and sea The machines were delivered to the site in Myanmar, to work in a particularly tough extraction operation. The fleet was delivered to a site in Kachin State in northern Myanmar, having been ordered by three local firms to carry blasted material haul distances of around 2km for processing. The three companies; Aung Hein Min Gems, Yar Za Htar Ne Gems and Myanmar Thura Gems contacted Yangon-based dealer Aung Hein Min