Skip to main content

Video highlights efficiency of UK bridge demolition project

The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of Digger
March 31, 2014 Read time: 1 min
The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of 7706 Diggers and Dozers.

For more information on companies in this article

Related Content

  • Mongolia’s capital Ulaanbaatar is redeveloping its airport
    August 23, 2016
    Mongolia’s economy is growing fast, with capital Ulaanbaatar the centre for activity. Being landlocked, the country depends heavily on aviation to carry passengers and cargo. The existing Chinggis Khaan International Airport was built in 1956 and upgraded in 1987 and 1997 for international traffic. But the old airport cannot meet demands and boosting the country’s capacity to handle flights is essential. The New Ulaanbataar International Airport (NUBIA) will triple passenger capacity to approximately 3
  • Telvent to implement its SmartMobility Road Suite in Saudi Arabia.
    May 14, 2012
    Telvent GIT has been awarded a contract by Almabani General Contractors to implement the Telvent SmartMobility Road Suite solution on the extension of the roads in Arriyadh Old Airport area. The project, lead by the High Commission for the Development of Arriyadh, will extend the existing north-south and east-west highways for more than 11 kms and the construction of three tunnels.
  • VIDEO - Canadian contractor demolishing overpass
    July 13, 2015
    Canadian contractor Delsan has carried out a successful demolition of an overpass in Quebec. The firm used a number of John Deere excavators equipped with breakers and cutters to break up the overpass in a controlled demolition job. The structure was located in Sainte-Anne-de-Bellevue and needed to be removed as it had been made redundant.
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes