Skip to main content

Video highlights efficiency of UK bridge demolition project

The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of Digger
March 31, 2014 Read time: 1 min
The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of 7706 Diggers and Dozers.

For more information on companies in this article

Related Content

  • VIDEO: Multiple pavers for Netherlands air base
    August 2, 2016
    A large fleet of asphalt road construction machines has been used at the Eindhoven Airbase in the Netherlands to reconstruct the runway.

    Contractor 7456 BAM Infra carried out the work to resurface the runway to the tight specifications and tight time frame requirements of the Royal Dutch Airforce.
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Morandi Bridge investigation continuing
    February 1, 2019
    The investigation into the collapse of the Morandi Bridge in the Italian city of Genoa is continuing. The failure of the bridge in August 2018 resulted in 43 fatalities. A central section of the structure collapsed and most of the deaths were of those crossing in vehicles at the time, although the deaths also included those hit by falling debris underneath. A number of engineers and managers with responsibilities relating to the bridge are now being investigated directly. The investigators are also looking