Skip to main content

Video highlights efficiency of UK bridge demolition project

The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of Digger
March 31, 2014 Read time: 1 min
The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of 7706 Diggers and Dozers.

For more information on companies in this article

Related Content

  • VIDEO: Bridge demolition jobs in CA
    November 23, 2015
    Explosive demolition techniques were used to remove a bridge structure in the US at the weekend. In California on the west coast, the removal of a pier from the old Bay Bridge structure was carried out. The explosive demolition was organised by 5246 Caltrans, with around 10tonnes of explosives being used to blast the redundant bridge pier. Protective layers of wood and steel were used to prevent debris from the massive 24.4m x 42.7m bridge pier from being thrown into the air.
  • EarthSense and Tantalum in UK project to cut road air pollution
    June 29, 2018
    Air quality specialist EarthSense is working with Oxfordshire County Council in England and connected vehicle company Tantalum to understand road traffic’s impact on air quality. Council fleet vehicles are being fitted with EarthSense’s Zephyr air quality measuring sensors that give real-time data on vehicle emissions and air quality along the route. The data collected by EarthSense will be used to coordinate traffic light control in an attempt to mitigate road congestion and, therefore, air pollution.
  • Austria’s challenging highway bridge replacement
    January 20, 2025
    A challenging highway bridge replacement is planned for Austria.
  • Francis Scott Key Bridge demolition
    July 3, 2025
    Demolition is planned for the Francis Scott Key Bridge.