Skip to main content

Video highlights efficiency of UK bridge demolition project

The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of Digger
March 31, 2014 Read time: 1 min
The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of 7706 Diggers and Dozers.

For more information on companies in this article

Related Content

  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Florida’s I-4 project wins major award
    December 15, 2015
    Florida’s I-4 Ultimate highway project recently won a major award. The I-4 won the Best Transport Project award at the 2015 P3 Awards ceremony. Among entries, the US$2.3 billion highway project was recognised for its scale, complexity, and overall performance. Stretching through Orlando, the I-4 Ultimate project is a massive makeover of 33.6km of highway. It includes over a dozen reconstructed interchanges, 74 rebuilt bridges, 53 new bridges, and construction of four new express lanes. According to the P
  • Atlas Copco for Brazil bridge demolition
    July 2, 2013
    Brazilian demolition specialist Comprex was chosen to demolish a bridge connecting districts in the city of Vitória in the state of Espirito Santo. For environmental reasons, debris was not permitted to fall into the waterway under the bridge, and special arrangements had to be made for the removal of the demolition waste. Comprex chose Atlas Copco hydraulic breakers and CombiCutters for the jobsite where three new bridges have been built over the old bridge, which was no longer able to support the increasi