Skip to main content

Two new Russian bridges being planned

Two major new bridge projects are being planned in Russia. One bridge will span the Volga River, the other will span the Yenisei River in Siberia.
October 1, 2019 Read time: 1 min

Design work for the third bridge spanning the River Volga near to Saratov will commence in 2020. The plans call for this new road bridge to be constructed close to the existing railway bridge.

Meanwhile in Siberia’s Krasnoyarsk Region, a bridge measuring over 2km is being planned. This project is expected to cost US$138 million and also involves building a new roundabout to connect the bridge road with existing roads.

Related Content

  • New bridges underway for Panama Canal
    October 13, 2015
    Panama is working on projects to construct two new bridge crossings over the Panama Canal. According to the Panama Canal Authority (ACP), work is progressing well on the project to build the third bridge over the Canal. The project is costing around US$570 million, of which USD 382mn have been already allocated. The bridge is due for completion in 2017. Meanwhile Panama's Ministry of Public Works (MOP) is opening the tender process to build select the project manager for the project to build the fourth brid
  • Russian road projects for St Petersburg and Moscow
    May 16, 2018
    Contractor VAD now looks likely to carry out rebuilding work for the northern stretch of St Petersburg’s Ring Road. This section of the ring road runs between the Priozerskoye Highway and the Western High-Speed Diameter route. VAD’s bid for the 14.3km stretch has received approval from the tender commission. The work will cost just over US$100 million to be carried out and should be complete by November 2020.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru