Skip to main content

Tunnel project in Poland

Spanish contractor OHL and Polish company Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland.
March 2, 2012 Read time: 1 min
RSSSpanish contractor OHL and Polish company 3206 Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland. The project involves the construction of a new road tunnel in the city of Gdansk and, including road connections, is worth some €172.05 million. To carry out the work the consortium is ordering a new tunnel boring machine (TBM) from German supplier Herrenknecht, worth €20.80 million. Included in the TBM order is sand separation equipment, with this machinery scheduled for delivery by September 2012 at the latest.

For more information on companies in this article

Related Content

  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • UK output of machinery and equipment takes an early summer dip
    August 10, 2017
    UK output from companies involved in manufacturing equipment and parts turned down in June, according to the latest data from the Office for National Statistics (ONS). Output in June was 4.3% lower than May, but was still 3.3% higher than June 2016 levels. Output in June was the lowest for the past seven months - since November 2016 - and has resulted in the six-month moving average flattening out for the first time this year. Output in the second quarter of 2017 was 1% down on the first quarter, but was st
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the