Skip to main content

Tunnel project in Poland

Spanish contractor OHL and Polish company Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland.
March 2, 2012 Read time: 1 min
RSSSpanish contractor OHL and Polish company 3206 Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland. The project involves the construction of a new road tunnel in the city of Gdansk and, including road connections, is worth some €172.05 million. To carry out the work the consortium is ordering a new tunnel boring machine (TBM) from German supplier Herrenknecht, worth €20.80 million. Included in the TBM order is sand separation equipment, with this machinery scheduled for delivery by September 2012 at the latest.

For more information on companies in this article

Related Content

  • Mont Blanc Tunnel maintenance closure
    April 26, 2024
    The Mont Blanc Tunnel will be closed for maintenance.
  • Nicaragua capital highway route financing secured
    June 26, 2017
    The financing package for a key highway project in Nicaragua’s capital Managua has now been secured.
  • Consortium for Italy's key highway project
    May 9, 2012
    The contract for Italy’s new Pedemontana Lombarda highway is likely to be handled by a consortium headed by Austrian contractor Strabag. The agreement will be finalised in September 2011. The consortium has a provisional deal for design and construction of the €2.3 billion 75km highway, which will connect Bergamo to Milan Malpensa airport, bypassing Milan. The consortium also includes Adanti, Grandi Lavori and Impresa Costruzioni Giuseppe Maltauro. The Pedemontana Lombarda highway project features a 65km st
  • Dressta offers Stage IIIB dozers
    January 6, 2017
    Polish manufacturer Dressta, now owned by LiuGong, has updated the engine in its TD14R dozer to bring the machine into line with recent emissions regulations. The TD14R is powered by a Cummins QSB6.7 engine delivering 119kW. The 18.7tonne dozer is available in standard, long and low ground pressure track models, with a three-point suspension system to maintain tractive effort on rough ground.