Skip to main content

Tunnel project in Poland

Spanish contractor OHL and Polish company Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland.
March 2, 2012 Read time: 1 min
RSSSpanish contractor OHL and Polish company 3206 Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland. The project involves the construction of a new road tunnel in the city of Gdansk and, including road connections, is worth some €172.05 million. To carry out the work the consortium is ordering a new tunnel boring machine (TBM) from German supplier Herrenknecht, worth €20.80 million. Included in the TBM order is sand separation equipment, with this machinery scheduled for delivery by September 2012 at the latest.

For more information on companies in this article

Related Content

  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Tunnelling technology award for Herrenknecht 
    October 26, 2022
    Herrenknecht has received the bauma Innovation Award 2022 in the Machine Technology category, for a new development in continuous tunnelling.
  • High output for BOMAG’s compact paver
    March 14, 2016
    BOMAG has upgraded its compact city paver, increasing output while reducing exhaust emissions and fuel consumption. A new engine meets the Tier 4 Interim/Stage IIIB emission standard, while a Tier 3/Stage IIIA diesel can also be fitted for markets where low sulphur fuel is not available. Customers can also choose from wheeled or tracked variants. The Ecomode regulates the hydraulics, engine speed and ventilation as required, saving fuel and reducing noise. The BF300-2 offers a throughput of 300tonnes/ho
  • High output for BOMAG’s compact paver
    January 6, 2017
    BOMAG has upgraded its compact city paver, increasing output while reducing exhaust emissions and fuel consumption. A new engine meets the Tier 4 Interim/Stage IIIB emission standard, while a Tier 3/Stage IIIA diesel can also be fitted for markets where low sulphur fuel is not available. Customers can also choose from wheeled or tracked variants. The Ecomode regulates the hydraulics, engine speed and ventilation as required, saving fuel and reducing noise. The BF300-2 offers a throughput of 300tonnes/ho