Skip to main content

Tunnel project in Poland

Spanish contractor OHL and Polish company Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland.
March 2, 2012 Read time: 1 min
RSSSpanish contractor OHL and Polish company 3206 Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland. The project involves the construction of a new road tunnel in the city of Gdansk and, including road connections, is worth some €172.05 million. To carry out the work the consortium is ordering a new tunnel boring machine (TBM) from German supplier Herrenknecht, worth €20.80 million. Included in the TBM order is sand separation equipment, with this machinery scheduled for delivery by September 2012 at the latest.

For more information on companies in this article

Related Content

  • Normet to invest over €7 million
    April 4, 2012
    Underground construction in the world is increasing, metal ores are mined deeper, and there is an ever-growing demand in emerging countries for metals, infrastructure and energy.
  • Norway’s new ‘green’ highway route
    November 13, 2020
    A new route in Norway will provide a faster and greener highway connection between the capital city Oslo and the northern city of Trondheim
  • Asphalt paving developments
    March 13, 2012
    US and European asphalt paving needs are different, but some firms are bridging that gap, reports Mike Woof. With a clear differentiation between the US and European asphalt paving markets, manufacturers from the latter are now developing machines aimed at the former. The US and European markets for paving machines have developed along very different lines. North American pavers are designed for high throughputs and high paving rates, having been designed to meet a need to build roads over long distances wi
  • Wacker Neuson’s new mini excavators break cover at INTERMAT
    January 6, 2017
    Wacker Neuson has renewed its 1.7 to 2.4tonnes mini excavator range with the introduction of the ET18, ET20 and ET24. The enlarged can has a lower and broader entrance for easier access and egress. The company’s Vertical Digging System (VDS) is an option, allowing the upperstructure to be set vertical when working on gradients up to 27%.