Skip to main content

Terex Trucks work on Austria’s North Autobahn A5 Vienna to Brno

Regional contractor Windisch has put five Terex TA300 articulated haulers to work shifting 1.4 million m3 of earth on the A5 motorway extension in Austria. The five 28tonne capacity TA300s have been selected by local contractor Windisch to take part in the expansion of the North Autobahn (A5) which will form a modern highway between Vienna in Austria and Brno in the Czech Republic. Austrian distributor Mlecka Construction, just outside of Vienna in Oeynhausen, supplied the vehicles that work 12-hour s
January 27, 2017 Read time: 2 mins
Regional contractor Windisch has put five 1222 Terex TA300 articulated haulers to work shifting 1.4 million m3 of earth on the A5 motorway extension in Austria.

The five 28tonne capacity TA300s have been selected by local contractor Windisch to take part in the expansion of the North Autobahn (A5) which will form a modern highway between Vienna in Austria and Brno in the Czech Republic.

Austrian distributor Mlecka Construction, just outside of Vienna in Oeynhausen, supplied the vehicles that work 12-hour shifts, six-days-a-week to shift 1.4 million m3 of earth.

Scheduled for completion in 2017, the project was implemented by Austria’s Autobahn and highway financing stock corporation, ASFiNAG at an estimated cost of €200 million.

The A5 is already a popular route due to the international checkpoint at Drasenhofen. Overall, it will ease traffic build up, shorten the 130km transit time between the two cities and reduce noise pollution.

“Like other EU countries, the Austrian market has proved difficult but the extension of the North Autobahn is one of the brighter investments in the tough articulated hauler market,” said John Mlonek, commercial sales manager at 8081 Terex Trucks.

Terex Trucks builds the TA300 at its Scottish factory in Motherwell. “Windisch was looking at other brands but chose to go with Terex Trucks, which is a real vote of confidence for our robust Scottish machines,” said Mlonek.

Terex said that with fully independent front suspension as standard, the TA300 maintains tyre/ground contact regardless of terrain, increasing tractive effort and reducing cycle times while also providing operators with a comfortable haul.

In addition, the transmission retardation system in combination with engine exhaust brake support the fully-enclosed oil-cooled multi-disc brakes for enhanced protection of the brakes, resulting in less maintenance and a longer life span for the brakes. The machine is powered by a fuel-efficient five-cylinder Scania DC9 engine, which develops 276 kW and maximum torque of 1,880Nm.

For more information on companies in this article

Related Content

  • New focus on hydraulics operations for Lonking
    November 12, 2014
    Lonking widening its product range and developing its hydraulics components operations - Mike Woof reports Shanghai-based Lonking is best known as a major supplier of wheeled loaders, and as one of the market leaders in China. The company has followed a path of diversification in recent years however, significantly widening its product range and with its excavator business in particular proving successful and taking a substantial share of the Chinese home market. Other Lonking products rolling off the produ
  • New focus on hydraulics operations for Lonking
    January 6, 2017
    Lonking widening its product range and developing its hydraulics components operations - Mike Woof reports Shanghai-based Lonking is best known as a major supplier of wheeled loaders, and as one of the market leaders in China. The company has followed a path of diversification in recent years however, significantly widening its product range and with its excavator business in particular proving successful and taking a substantial share of the Chinese home market. Other Lonking products rolling off the produ
  • Czech tunnel delays
    March 6, 2012
    Progress is being made in the Czech Republic on two key urban tunnel projects. In capital Prague, the Czech contractor Metrostave has now completed the drilling portion of the Letna section of the Blanka road tunnel. Local residents have complained about the noise, vibration and cracks in their properties that they say have been generated by the drilling and blasting work. The project looks as though its completion date will be later than first planned however.
  • New Doosan DL420-5 in Poland shows power of simplicity
    May 17, 2017
    One of Poland’s largest suppliers of feldspar is Strzeblowskie Kopalnie Surowców Mineralnych, based in Sobotka and nestled against Mount Sleza. This area in Lower Silesia is rich in minerals with Sleza a centre of granite production. Strzeblowskie Kopalnie has been operating a fleet of Doosan equipment at its 100hectare quarry, the latest being a new DL420-5 Stage IV compliant wheeled loader. The quarry produces feldspar and granite aggregates, much of it for use in the ceramics industry. Janusz Kozyrski, c