Skip to main content

Terex Trucks work on Austria’s North Autobahn A5 Vienna to Brno

Regional contractor Windisch has put five Terex TA300 articulated haulers to work shifting 1.4 million m3 of earth on the A5 motorway extension in Austria. The five 28tonne capacity TA300s have been selected by local contractor Windisch to take part in the expansion of the North Autobahn (A5) which will form a modern highway between Vienna in Austria and Brno in the Czech Republic. Austrian distributor Mlecka Construction, just outside of Vienna in Oeynhausen, supplied the vehicles that work 12-hour s
January 27, 2017 Read time: 2 mins
Regional contractor Windisch has put five 1222 Terex TA300 articulated haulers to work shifting 1.4 million m3 of earth on the A5 motorway extension in Austria.

The five 28tonne capacity TA300s have been selected by local contractor Windisch to take part in the expansion of the North Autobahn (A5) which will form a modern highway between Vienna in Austria and Brno in the Czech Republic.

Austrian distributor Mlecka Construction, just outside of Vienna in Oeynhausen, supplied the vehicles that work 12-hour shifts, six-days-a-week to shift 1.4 million m3 of earth.

Scheduled for completion in 2017, the project was implemented by Austria’s Autobahn and highway financing stock corporation, ASFiNAG at an estimated cost of €200 million.

The A5 is already a popular route due to the international checkpoint at Drasenhofen. Overall, it will ease traffic build up, shorten the 130km transit time between the two cities and reduce noise pollution.

“Like other EU countries, the Austrian market has proved difficult but the extension of the North Autobahn is one of the brighter investments in the tough articulated hauler market,” said John Mlonek, commercial sales manager at 8081 Terex Trucks.

Terex Trucks builds the TA300 at its Scottish factory in Motherwell. “Windisch was looking at other brands but chose to go with Terex Trucks, which is a real vote of confidence for our robust Scottish machines,” said Mlonek.

Terex said that with fully independent front suspension as standard, the TA300 maintains tyre/ground contact regardless of terrain, increasing tractive effort and reducing cycle times while also providing operators with a comfortable haul.

In addition, the transmission retardation system in combination with engine exhaust brake support the fully-enclosed oil-cooled multi-disc brakes for enhanced protection of the brakes, resulting in less maintenance and a longer life span for the brakes. The machine is powered by a fuel-efficient five-cylinder Scania DC9 engine, which develops 276 kW and maximum torque of 1,880Nm.

For more information on companies in this article

Related Content

  • Terex trucks make epic tough trek
    June 21, 2016
    A fleet of 29 Terex Trucks recently made a journey of 20,800km by road, river and sea The machines were delivered to the site in Myanmar, to work in a particularly tough extraction operation. The fleet was delivered to a site in Kachin State in northern Myanmar, having been ordered by three local firms to carry blasted material haul distances of around 2km for processing. The three companies; Aung Hein Min Gems, Yar Za Htar Ne Gems and Myanmar Thura Gems contacted Yangon-based dealer Aung Hein Min
  • Bell Equipment launches two axle hauler with bigger payload
    April 9, 2018
    Bell Equipment is now offering a twin axle variant of its 28tonne capacity hauler called the B30E 4x4. This machine is aimed at use with small to medium-sized quarries that feature integrated aggregate production facilities. However the firm claims that the new machine offers distinct advantages over more conventional haulers. According to Bell Equipment product marketing manager, Tristan du Pisanie, the Bell B30E 4x4 offers a key alternative to the company's conventional 6x6 ADT. This new model provides a
  • Introducing easy to operate, advanced ADT
    February 14, 2012
    One of the most notable developments in the loading and hauling sector though again comes from Liebherr, with the long awaited launch of its ADT range.
  • Introducing easy to operate, advanced ADT
    April 10, 2012
    One of the most notable developments in the loading and hauling sector though again comes from Liebherr, with the long awaited launch of its ADT range.