Skip to main content

Slovakia tunnel excavation complete

Excavation work on Slovakia’s Visnove Tunnel has now been completed. Driving the tunnel took nine months longer than originally anticipated. The 7.5km tunnel will be Europe’s seventh longest when complete and forms part of the D1 highway between Dubna Skala and Lietavska. Work on this highway started in 2014, with the construction being carried out jointly by Italian contractor Salini Impregilo and local firm Duha. Fitting out of the tunnel is now commencing, with equipment such as ventilation and traffic
September 21, 2018 Read time: 1 min

Excavation work on Slovakia’s Visnove Tunnel has now been completed. Driving the tunnel took nine months longer than originally anticipated. The 7.5km tunnel will be Europe’s seventh longest when complete and forms part of the D1 highway between Dubna Skala and Lietavska. Work on this highway started in 2014, with the construction being carried out jointly by Italian contractor 7809 Salini Impregilo and local firm Duha. Fitting out of the tunnel is now commencing, with equipment such as ventilation and traffic control systems being installed. The stretch of the D1 from Dubna Skala to Lietavska is costing €500 million to build.

For more information on companies in this article

Related Content

  • Italian equipment sales remain strong to Q3 2018
    January 10, 2019
    Italian construction machinery exports reached nearly €2.2 billion for the first nine months of 2018, up 6.2% on the same period 2017. Imports were also up, rising 14.4% to hit €710 million, according to the latest surveys made available by the SaMoTer - Prometeia Observatory based on the information input from Unacea, the Italian construction equipment manufacturers’ association. Italian-built earthmoving machinery and equipment took the largest share of orders from abroad, worth more than €1 billio
  • Key link for Chile
    May 28, 2012
    Work will commence on a key new road tunnel connecting in Chile in 2001. The Chacabuco II tunnel will provide another road link between Santiago and the Andes mountain range along the Los Libertadores highway. This will improve Chile's connection with neighbouring Argentina as the highway runs to the border. The 2km tunnel will run parallel to the existing Chacabuco I tunnel, and will carry two lanes of traffic running towards Santiago.
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports