Skip to main content

New New Zealand highway for North Island

A new highway project is being planned for New Zealand’s North Island.
September 25, 2019 Read time: 1 min

The US$399 million (NZ$620 million) highway would take the place of the existing Manawatu Gorge Road. A preferred alignment has been set out and preparations are now underway. The 11.5km route will feature two lanes in either direction for most of its length and will feature a viaduct over the river. It will link Stoney Creek Road with Woodville, while it is due for completion in 2024. The SH3 Manawatu Gorge Road dates back to 1872 but was closed to traffic in 2017 due to problems with frequent landslips.

Related Content

  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.
  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.
  • New Zealand transport infrastructure works
    August 29, 2022
    New Zealand is to benefit from transport infrastructure works.
  • Australia highway project underway in Victoria State
    October 5, 2018
    Construction work is now well underway in Australia on the Monash Freeway upgrade in Victoria State. The project has entered its second stage and is costing US$513.5 million (A$711 million. The work involves building 36km of new lanes as well as installing the latest traffic information technology for drivers. For the section from Warrigal Road to the EastLink the router will be widened to five lanes in either direction, compared with four in either direction at present. Meanwhile between Clyde Road and Car