Skip to main content

New New Zealand highway for North Island

A new highway project is being planned for New Zealand’s North Island.
September 25, 2019 Read time: 1 min

The US$399 million (NZ$620 million) highway would take the place of the existing Manawatu Gorge Road. A preferred alignment has been set out and preparations are now underway. The 11.5km route will feature two lanes in either direction for most of its length and will feature a viaduct over the river. It will link Stoney Creek Road with Woodville, while it is due for completion in 2024. The SH3 Manawatu Gorge Road dates back to 1872 but was closed to traffic in 2017 due to problems with frequent landslips.

Related Content

  • Guatemala’s new bridge will cut traffic delays
    November 22, 2023
    Guatemala’s new bridge will cut congestion and traffic delays.
  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • Major new road and bridge projects underway in India
    December 22, 2016
    A series of major road and bridge projects is now underway in India. One of the most notable is the US$500 million project to build a new bridge spanning the River Ganges, which will be the longest in the country. Financing for the 9.8km bridge has been provided in the shape of a loan from the Asian Development Bank (ADB). The new link will be located close to Patna and is spanning both channels of the Ganges at this point and it features a cable-stayed design. The new bridge is required as the original str
  • New Zealand link
    May 15, 2012
    A major milestone has been achieved in New Zealand on a major road project that is intended to deal with a major traffic bottleneck in the city of Auckland. The launching gantry team has now installed the last segment of the new northbound viaduct, a key stage in the Newmarket Viaduct Replacement project. There is currently a 1.5m gap between the segments. So, on Saturday 3rd and Sunday 4th December the two viaducts will be cemented together in an 18 hour procedure known as the Stitch. From then until the e