Skip to main content

Caterpillar drill performing in US quarry

A Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US. The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines. Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier gener
May 11, 2015 Read time: 2 mins
Caterpillar MD5150C Top Hammer Drill working at Tower Rock
A Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US.

The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines.

Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier generation DTH drill the operation already has onsite. Key features of the machine’s productivity include the efficient Cat HPR6832 hydraulic rock drill, the new carousel rod changer and the efficient Cat C11 Engine.

While penetration rates are high, the cost/m drilled are also said to be low, which is helping Iron Mountain deliver good cost efficiency. The rig is used to drill 140mm diameter holes to depths of 21.33m, using 68mm diameter drill rods. The bits can last 335-366m, which is the same consumption rate as the previous DTH rig. Fuel consumption and drill road wear, on the other hand, is lower than for the DTH drill. According to 178 Caterpillar, owning and operating cost are lower while the simple rock drill design allows it to be serviced in the field.

Earlier trials at a Tower Rock limestone quarry near St Genevieve, Missouri showed similar good performance for the Cat drill.  The site has softer rock conditions and the MD5150C outpaced a DTH drill. Austin Powder carried out a bore tracking test, while the results showed a hole deviation rate with the MD5150C rig was within the desired range. This last is of note as while tophammer rigs are known for their productivity, DTH machines are known for hole straightness. Achieving good hole straightness with a tophammer machine is of note. This point is crucial for efficient blasting and deviation of blastholes reduces blasting efficiency and results in greater percentages of fines that go to waste or oversized material that requires secondary breaking, further adding to quarrying costs.

For more information on companies in this article

Related Content

  • Caterpillar offers high performance, compact compactors
    January 28, 2014
    Caterpillar claims its new line-up of utility compactors offer a range of key upgrades. The CB22B, CB24B, CB24B XT, CB32B, CB34B, CB34B XW, CC24B and CC34B models are versatile compactors that share technical and performance features and compete in the 1.8-5tonne size range. Efficient compaction is said to be achieved due to better visibility, increased drum diameters, multiple frequency vibratory systems and optional ballast additions on some models. The B-Series compactors are equipped with C1.5 and C2.2
  • Ground control to mining truck offers efficiency gains
    June 19, 2015
    Autonomous and remote control machines are not about to take over the world, but they can provide efficiency gains and savings in some operations – Colin Sowman writes The thought of autonomous machines may conjure up visions of an Orwellian future where society works for the ‘common good’ defined by an all-powerful being and in which people are insignificant in terms of their needs, aspirations and physical wellbeing; of machines that relentlessly carry out their task regardless of anybody or anything that
  • High quality Swedish stone
    April 13, 2012
    Close to Sweden's second largest city Göthenburg lies the efficient Jehander quarrying operation run by Heidelberg Cement. The site produces around 9,000tonnes/day at peak seasonal demand and has an output of some 1,000,000tonnes/year. The site has recently renewed its operating permission and now has the necessary approval to work until 2021. Niklas Osvaldsson is regional manager for Heidelberg Cement and said, "Since early 2000 this has been part of the Heidelberg Group." Stone production originally st
  • Terex built for bridge paving
    November 29, 2012
    To meet a need to carry out complex modern bridge designs, the Terex Bid-Well 3600 paver is available with truss transition inserts, increasing maximum paving width from 27.4-33.5m. The inserts adjust truss depth from 914-1219mm toward the paver’s centre, reducing frame deflection and this is said to increase surface profile smoothness. Offering paving widths from 4.6-33.5m with optional transition inserts, the 3600 gives companies more versatility for paving a wide variety of bridge designs, including mult