Skip to main content

Caterpillar drill performing in US quarry

A Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US. The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines. Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier gener
May 11, 2015 Read time: 2 mins
Caterpillar MD5150C Top Hammer Drill working at Tower Rock
A Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US.

The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines.

Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier generation DTH drill the operation already has onsite. Key features of the machine’s productivity include the efficient Cat HPR6832 hydraulic rock drill, the new carousel rod changer and the efficient Cat C11 Engine.

While penetration rates are high, the cost/m drilled are also said to be low, which is helping Iron Mountain deliver good cost efficiency. The rig is used to drill 140mm diameter holes to depths of 21.33m, using 68mm diameter drill rods. The bits can last 335-366m, which is the same consumption rate as the previous DTH rig. Fuel consumption and drill road wear, on the other hand, is lower than for the DTH drill. According to 178 Caterpillar, owning and operating cost are lower while the simple rock drill design allows it to be serviced in the field.

Earlier trials at a Tower Rock limestone quarry near St Genevieve, Missouri showed similar good performance for the Cat drill.  The site has softer rock conditions and the MD5150C outpaced a DTH drill. Austin Powder carried out a bore tracking test, while the results showed a hole deviation rate with the MD5150C rig was within the desired range. This last is of note as while tophammer rigs are known for their productivity, DTH machines are known for hole straightness. Achieving good hole straightness with a tophammer machine is of note. This point is crucial for efficient blasting and deviation of blastholes reduces blasting efficiency and results in greater percentages of fines that go to waste or oversized material that requires secondary breaking, further adding to quarrying costs.

For more information on companies in this article

Related Content

  • Booming Chinese aggregate demand
    February 22, 2013
    Global demand for construction aggregates is set to increase 5.2% a year until 2015 to 48.3 billion tonnes, according to research by The Freedonia Group in the United States. The same source tips China alone to account for half of all new aggregate demand worldwide in the period 2010-2015. Guy Woodford reports on the growing importance of the Asian aggregates market. China is already the biggest nation for aggregate production and use in the world, and the competition among the giants of aggregate productio
  • Driving ahead with tunnelling developments
    June 13, 2012
    New technologies are coming to market with regard to driving and supporting tunnels, with drilling and blasting and accompanying shotcreating technologies being widely used worldwide. Drilling and blasting can be a cost-effective method in the right conditions and in this segment Atlas Copco and Sandvik hold major market shares worldwide, although other firms such as Furukawa and Montabert also compete. Shotcreting equipment is widely used following after drilling and blasting, with CIFA broadening its rang
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • MOBA’s innovative drill control offers efficiency
    January 6, 2017
    MOBA continues to develop its novel MDS-2000 drilling system. This package has already proven itself in use for blast hole drilling in many operations and can now be used to record the orientation of the machine with GNSS antennae and the height using laser reference. With telesupport, MOBA also offers fast service through an Internet connection. By recording the machine orientation using two GNSS antennae, the torsion on the machine can be determined with very high accuracy and included in the calculation