Skip to main content

Tunnelling project under Micang Mountain

Equipment from XCMG has played an important role in the excavation of a new tunnel link underneath the Micang Mountain in China. The project to build the right-hand bore for the Micang Mountain tunnel on the Sichuan-Shaanxi Expressway has taken 54 months to complete. The tunnel was needed as the Micang Mountain has been a barrier to direct transportation at the junction of Hanzhong and Bazhong. This has blocked the major transport route between Sichuan and Shaanxi, preventing traffic flows across the reg
October 15, 2018 Read time: 2 mins
Roadheaders from XCMG carried out the tunnel excavation work
Equipment from 2490 XCMG has played an important role in the excavation of a new tunnel link underneath the Micang Mountain in China.


The project to build the right-hand bore for the Micang Mountain tunnel on the Sichuan-Shaanxi Expressway has taken 54 months to complete.

The tunnel was needed as the Micang Mountain has been a barrier to direct transportation at the junction of Hanzhong and Bazhong. This has blocked the major transport route between Sichuan and Shaanxi, preventing traffic flows across the region. Now that the 13.8km long Micang Mountain Tunnel is complete, there is a direct route that will cut journey times substantially.

Now that the project is complete, this is the third longest road tunnel in the world, and the longest in China. The tunnel on the Sichuan-Shaanxi Expressway will slash the travel time for travelling around the Micang Mountain from four hours to just 30 minutes now that drivers can go directly underneath.

Inaccessibility of the site provided the biggest challenge to the construction workers as the construction work was carried out in an area that was difficult to access. However, there were many other challenges also including tropical rain, highly stressed rock conditions and high concentrations of dangerous gases.

The rare brittle rock mass in the high geostress area that the Micang Mountain Tunnel traverses has a high risk of rock bursts, landslides, fractures, cracks and even cave-ins. To maximise safety, this required real-time monitoring of the rock conditions throughout the construction operation. In addition, toxic gases released during tunnel excavation operations required workers to wear safety gear, adding to discomfort for personnel.


In order to overcome these difficulties and speed the construction work, mechanised cutting was selected as the main tunnelling method at the start of the project. XCMG’s Railway Equipment Division sent its two triple boom drilling jumbos to the project contractor: First Project Department under China Railway Engineering Group to assist in the tunneling operation. XCMG also supplied the mechanised cutting equipment that carried out the majority of the tunnel driving work. Both the drill jumbo and the roadheader machines performed reliably, despite the tough conditions, helping to ensure that the work was completed successfully.

For more information on companies in this article

Related Content

  • MB’s versatile crusher buckets entering Chinese market
    November 21, 2018

    MB crusher is now offering its high performance crusher buckets into the Chinese market, as well as the rest of South East Asia. The firm is introducing two models for excavators, the BF120.4 model to China, which is suitable for excavators in the 30tonne class and above, as well as the BF90.3, which is suited for excavators weighing from 21tonnes and above. In addition, MB Crusher is now offering the MB-L200 crusher bucket, which is designed for use with wheeled loaders, backhoe loaders and skid steer loaders.

  • Chinese manufacturers plan to compete globally
    June 18, 2015
    Chinese construction equipment firms have been building their operations in local markets – but are now looking to develop globally - Mike Woof writes In recent years Chinese construction equipment manufacturers have been able to capitalise on local demand in the home market. The rapid rate of expansion of transport infrastructure, fuelled by government spending, led to a massive need for construction machines. The country’s manufacturers have grown rapidly in size, investing enormously in factory capacity
  • Sandvik’s new DT912D jumbo offers intelligent drilling efficiency
    June 17, 2016
    Sandvik Construction is introducing what it says is a completely new tunneling jumbo, the DT912D, especially for limestone applications. The DT912D - a high reach, single boom jumbo - is completely self-contained. It is powered with a fuel-efficient and environmentally friendly Tier 4 Final diesel engine and equipped with onboard compressor and water tank for air-mist flushing. Sandvik says the state-of-the-art control system will bring increased productivity in both tunneling and underground mine pro
  • XCMG provides rescue capabilities to Chinese earthquake area
    January 5, 2015
    Within 24 hours after the 6.5 magnitude earthquake, XCMG was hard at work on site XCMG recently provided a fast emergency response to an earthquake-stricken area of China. The firm’s rescue team rushed to provide help following the 6.5-magnitude earthquake which hit Ludian County in Yunnan Province. Rescuers reported 398 deaths, 1,801 injured, and in excess of 10,000 buildings having collapsed.