Skip to main content

Terex trucks make epic tough trek

A fleet of 29 Terex Trucks recently made a journey of 20,800km by road, river and sea The machines were delivered to the site in Myanmar, to work in a particularly tough extraction operation. The fleet was delivered to a site in Kachin State in northern Myanmar, having been ordered by three local firms to carry blasted material haul distances of around 2km for processing. The three companies; Aung Hein Min Gems, Yar Za Htar Ne Gems and Myanmar Thura Gems contacted Yangon-based dealer Aung Hein Min
June 21, 2016 Read time: 4 mins
Loading the trucks onto the barge had to be carried out carefully to avoid capsizing
A fleet of 29 Terex Trucks recently made a journey of 20,800km by road, river and sea

The machines were delivered to the site in Myanmar, to work in a particularly tough extraction operation.

The fleet was delivered to a site in Kachin State in northern Myanmar, having been ordered by three local firms to carry blasted material haul distances of around 2km for processing.

The three companies; Aung Hein Min Gems, Yar Za Htar Ne Gems and Myanmar Thura Gems contacted Yangon-based dealer Aung Hein Min (AHM Heavy) to supply the machines. The order was substantial as it comprised 19 TR100s with capacities of 91tonnes and 10 TR60s with capacities of 55tonnes.

For two of the customers, haulers from 8081 Terex Trucks had already proved their worth. Aung Hein Min Gems had previously ordered six 38tonne capacity TA400 articulated haulers, while Yar Za Htar Ne Gems had 20 of the TA400s in its fleet. However the other company was new to the brand but opted for these machines as the neighbouring firms had seen good performance with their earlier units of the same brand.

Transporting the machines over 20,800km from the manufacturing plant in Motherwell, Scotland to the isolated extraction sites located at Phakant in Kachin State, northern Myanmar presented a challenge however.

The first part of the journey took five weeks, with the trucks being transported 16,668km by containership to Yangon, via Singapore. Once in Yangon the trucks were then transferred onto three barges, with a maximum of 10 trucks/barge.

However, loading the trucks onto the barges was no easy task according to AHM Heavy. To avoid capsizing the barges, the trucks were loaded in a shuffle sequence to maintain the balance until all machines were in place. Water levels were also critical as had the water level been too low, it would not have been sufficient to support the barge and its cargo. Converesely had the water level been too high the river would have been fast flowing and this could have seen a major risk from the barge and trucks being swept away.
The loading work was carried out safely however and the trucks then began their journey along the Uyu River to Phakant’s closest port, Kathar. This part of the trip, a distance of just under 966km, took a further three weeks.

Once the trucks were again unloaded, the final 193km portion of the journey took just three days, with the trucks driving to the site equipment yards in Phakant. But even this part of the journey was difficult. The trucks were delivered during Myanmar’s wet season so the roads along the route were often flooded and very muddy. Moreover, the roads had not been primarily designed for large off-highway haulers with their wider track design. However being off-highway haulers, the machines were able to cope with the difficult conditions and did reach the site without incident.

When the fleet of machines arrived at the final destination, the units were then tested and commissioned by AHM Heavy’s engineers. With this process completed, the trucks then had to be registered with the Myanmar Government. This new registration scheme takes three to four weeks and is required of all existing and new equipment operated at the country’s extraction sites.

Since being commissioned, the trucks have been working almost round the clock. However, the machines are only operated during Myanmar’s dry season, which runs from roughly November to May and for the remainder of the year, they have to be parked as conditions are too difficult for full extraction work at the site.

For more information on companies in this article

Related Content

  • Terex targeting “mineral wealth” led growth markets
    July 2, 2013
    A senior Terex figure said the leading construction equipment manufacturer is hard at work targeting future “mineral wealth” led sales growth opportunities in Africa, Russia, Asia and Australia. Speaking during the recent Terex Truck Days event at the firm’s articulated and rigid dump truck manufacturing facility in Motherwell, Scotland, John Mlonek, commercial sales manager for Terex Construction, said, “With the downturn in Europe, lots of our efforts have gone more into markets like South Africa, which i
  • Terex Trucks appointing new Qatar dealer
    May 19, 2015
    Terex Trucks is appointing Rumaillah Motors WLL as its new dealer for Qatar. This pivotal move is intended to boost dealer support for the haulers from Terex Trucks, which are built in Motherwell, Scotland. The Terex hauler brand has been well known in the Middle East for the last two decades and the move appointing Rumaillah Motors WLL as the dealer for Qatar strengthens support for this range. The partnership with Rumaillah Motors follows Terex Truck’s recent acquisition by Volvo Construction Equipment.
  • Terex Trucks strengthens support in Angola
    March 28, 2017
    Terex Trucks is boosting its customer support in Angola with the appointment of Auto Maquinaria. The firm is now the official distributor of the Terex Trucks brand articulated and rigid dump trucks in Angola. Headquartered in its newly-opened facility in the capital Luanda, AMQA will also provide factory-approved parts and other essential aftermarket care services to customers throughout the country in Southern Africa. Pleased with the addition of Terex Trucks’ machines to the company’s portfolio, Adrian
  • Terex Trucks launches TA400, a new-generation articulated hauler
    March 15, 2016
    Terex Trucks has rolled out its flagship 38tonne TA400 articulated dump truck, the largest and first of the Volvo-owned company’s new generation hauler lineup. Investments have been made to ensure increased durability and protection of truck components, including upgraded hydraulic hoses, electrical interfaces, transmission mountings and brake pipes. To prolong hydraulic component lifecycles, Terex Trucks has introduced magnetic pressure filters that reduce the risk of contaminants entering the system