Skip to main content

SDLG wheeled loaders assisting in Georgia’s concrete production

A fleet of wheeled loaders from SDLG is playing a key link in the chain for producing concrete at a facility in Georgia. With this equipment HeidelbergCement Georgia and HeidelbergBeton Georgia are proving able to keep pace with an intensive production schedule at a number of concrete production sites across Georgia. Overall HeidelbergCement Caucasus has seven concrete and two cement manufacturing plants in Georgia that are running SDLG wheeled loaders. The company’s SDLG fleet comprises LG936L, LG953 and L
March 13, 2015 Read time: 3 mins
Durabilty and reliability are crucial in the difficult working conditions, with service support also playing a key role in maximising uptime
A fleet of wheeled loaders from SDLG is playing a key link in the chain for producing concrete at a facility in Georgia. With this equipment HeidelbergCement Georgia and HeidelbergBeton Georgia are proving able to keep pace with an intensive production schedule at a number of concrete production sites across Georgia.

Overall 2551 HeidelbergCement Caucasus has seven concrete and two cement manufacturing plants in Georgia that are running SDLG wheeled loaders. The company’s 5316 SDLG fleet comprises LG936L, LG953 and LG968 models, which are being used for a variety of tasks, including cement loading and aggregates handling from the on-site quarries.

HeidelbergCement Caucasus is seeing strong demand with output having to increase accordingly, so reliable equipment is vital.

SDLG branded machines are built in Linyi, China and the manufacturer’s dealer for Georgia is Elite Motors, providing parts and service support. This back-up is said to be crucial to maximise machine uptime in the tough working conditions of the concrete plants. Tyres, buckets and teeth in particular need regular inspections to ensure timely replacements given the tough conditions and abrasive materials being handled.

Elite Motors carries out maintenance checks every 250 hours for HeidelbergCement and HeidelbergBeton, paying particular attention to components such as the driveline to ensure wear is minimal. The firm’s technicians also provide support for the parts and consumables that need to be replaced, such as hydraulic oil, fuel, air filters, engine oil and pins, and fitting OEM-approved parts from SDLG. Elite Motors runs a large service centre at Daba Tsitsamuri and also employs a team of mobile technicians capable of reaching customers across the country.

Although HeidelbergCement’s entrance to the Georgian market is relatively recent, the company is already the leading producer of cement and concrete in the country. 

Production volume across the company’s two cement plants averages around 1.7 million tonnes of cement and clinker per year. As for its seven concrete locations (with nine production plants) volume averages around 880m3/hour and a three-shift system is in place to maximise output. As a result, the SDLG wheeled loaders are run almost continually.

The smallest of the loaders in the HeidelbergBeton fleet are the three LG936L units, which have a lift capacity of 3tonnes. These lighter loaders are manoeuvrable and powered by a 92kW WeichaiDeutz engine.

The 2m3 bucket on the units can be raised to a dumping height of 3.3m and the maximum breakout force is 96kN.

The next largest wheeled loader in the HeidelbergCement and HeidelbergBeton fleet are the five LG953 units, which have a maximum lift capacity of 5tonnes. With a longer wheelbase than the 3tonne capacity units and greater lifting ability, the LG953 units are powered by a 162kW WeichaiDeutz engine.

 The 3m3 bucket can be raised to a dumping height of 3.4m and the maximum breakout force is 16kN. Largest of the SDLG units in the Heidelberg fleet are the two LG968 units.

They are most often used for aggregate loading. These powerhouses have a 6tonne lift capacity and are among the largest available from SDLG. Maximum breakout force is 210kN and the machine’s 3.5 – 4m3 bucket can be raised up to 3.9m. Power for these larger units comes from a 191kW WeichaiDeutz engine.

For more information on companies in this article

Related Content

  • Volvo CE boss highlights company success in China
    November 28, 2012
    Volvo Construction Equipment (Volvo CE) has invested over US$150.93 million (SEK1bn) in expanding capacity and construction equipment offering in China and had secured a leading position in national wheeled loader and excavator sales, said Volvo CE president Pat Olney. The Swedish construction equipment manufacturer is also keen to develop its SDLG brand, which, Olney stressed, has helped Volvo CE secure its status in the Chinese wheeled loader and excavator market.
  • SDLG and Alibaba form partnership
    June 6, 2018
    SDLG and Alibaba have formed partnership intended to improve intelligent manufacturing in China. SDLG says it will use Alibaba’s business intelligence expertise to modernise production, increasing efficiency and flexibility in the process. The partnership is aimed at developing the manufacturing techniques at SDLG’s assembly plants at Linyi in China. By partnering with Alibaba, the company hopes to use such innovations as artificial intelligence, machine-to-machine communication and intelligent devices to
  • CASE’s CX750D excavator is a quarrying winner
    March 7, 2018
    CASE Construction Equipment’s (CASE) CX750D crawler excavator is the largest and most powerful machine in the brand’s excavator range. The CX750D is said to deliver best-in-class productivity, operating at 381kW with up to 366kN of bucket digging force. It meets Tier 4 Final standards with minimal maintenance, no diesel particulate filter (DPF), no DPF regeneration or associated lifetime service costs. The undercarriage and front attachment have been reinforced in most of the D Series: in particular, the CX
  • Manitowoc cranes construct Portugal's tallest viaduct
    April 16, 2012
    Five Potain cranes were used to build pylons for the Viaduto do Corgo project in Portugal. The recently completed 2.8km viaduct is one of the longest and tallest in the country. The machines were supplied by Manitowoc's Portugal office on a rental contract, who managed the cranes throughout the project. In addition to installing the cranes, the local Manitowoc Crane Care team also climbed and relocated the cranes as work progressed. Each crane worked with a 45m jib and constructed four pylons at a time. In