Skip to main content

New tunnel Acapulco Bay in Mexico

Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t
May 25, 2016 Read time: 4 mins
The electro-hydraulic tunnelling jumbo unit features three booms that can excavate an area 18m wide by 11m high
Acapulco is to benefit from a new tunnel route to cut congestion

A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain to Acapulco Bay can take over two hours.

However when the 3.2km tunnel contractor Acatunel completes the work, the congestion problem will be alleviated and the journey times will reduce accordingly. The route of the tunnel runs through the Cumbres de Llano Largo Mountain.

Because delays are frequent, the local authorities became increasingly concerned about the potential loss to the tourist trade, as well as to the extended journey times suffered by local residents. In 2013 the Guerrero State legislators decided to allocate US$213.4 million (3.5 billion pesos) for construction of what will be the longest highway tunnel in Mexico.

The Acapulco tunnel will slash the commute time from the airport to the Acapulco Bay resorts to a few minutes, reduce the crash rate, and help boost economic development around the bay. The infrastructure project also includes new interchanges and flyovers. In all, the new toll road running north from the airport through the tunnel will be 8km long.

A Mexican contractor, Acatunel de CV Consorcio ICA – Carso, won the bidding process to drill the 3.2km tunnel through the Cumbres de Llano Largo Mountain, part of the rugged Sierra Madre del Sur range. The new tunnel will run from Cayaco on the south side of the mountain to Brisamar on the bay side. To undertake this arduous project Acatunel engineers are using 325 Sandvik DT820-SC and DT1131-SC tunnelling jumbos, with this portion of the project due for completion by July 2016. Acatunel is part of Ingenieros Civiles Asociados (ICA), an international company founded in Mexico City 68 years ago and the first Mexican company to be listed on the NYSE.

Acatunel teams are drilling through the mountain in two 12-hour shifts/day, with the tunnel advancing about 7.2m/working day. However the geology in the Cumbres de Llano Largo has proven to be challenging. The base of Cumbres de Llano Largo Mountain itself is comprised mostly of granite (made up of quartz, mica and felspar) and basalt. These two abrasive and hard types of rock are tough, both for the drilling teams and their equipment.
One particular problem is that a great deal of water is being encountered, which has to be collected and diverted. The rock features frequent fractures, which lead to collapses and landslides. “What happens is that the ceiling of the tunnel falls in, leaving a hollow upper part over the tunnel,” said Miguel Angel Banuet Rodríguez, the project’s general supervisor. “This hollow space needs to be filled in with shotcrete or hydraulic concrete so as to make it safe. This causes delays.”

In addition to dealing with geological faults, the drilling crews are working on a downward sloping tunnel floor, which worsens the water issues. The stability of the rigs is important due to the sloping conditions and in this regard, the Sandvik units perform well. Though the DT1131-SC for example is 18m long, its SAHR fail-safe disc brakes lock the machine in place while its 44tonne weight helps boost its stability..

Acatunel is using Sandvik T38-Hex35-R32 4.9m rods, T38-T38 couplings and RD525 drifter shanks with 48mm bits, which are said to cope well with the tough rock conditions. Acatunel has also used Sandvik DX680 and DX700 rigs to open the portals, and to provide benching for water drainage within the tunnel.

Ari Laitinen travelled from Finland to Acapulco to provide technical training to Acatunel. And Sandvik has also provided support from closer at hand, from the Mexico Sandvik Construction headquarters in Guadalajara.

There are plans also for a second parallel tunnel should the traffic volumes increase beyond the 13,500/day this first drive has been designed for. Should that get the go-ahead, Acatunel is also likely to carry out the work.

For more information on companies in this article

Related Content

  • Sydney Airport road link tender opening
    July 17, 2019
    The tender process is opening for a new road link to connect with Sydney International Airport in Australia’s New South Wales State. Called the ‘Sydney Gateway Project’ the new road link is expected to cost in the region of US$1.55 billion (A$2.2 billion) to build. The new route would improve transport connections between Paramatta, on the city’s western side, and the airport, located to the east. Building the new road connection is expected to help lower peak time congestion and journey times for drivers.
  • Colombian highway connections under construction
    April 9, 2014
    In Colombia work on the dual carriageway connecting Bogota and Buenaventura is now 40% complete. The link should be complete by the end of 2016. The Bogota-Girardot road is now opening, with excavation work still underway on the La Linea tunnel. The tunnel section of the project has been subject to delays arising from geological issues but when it is open, the tunnel will cut travel times and also improve safety over the existing route. The driving of the tunnel should be complete by September 2014 with the
  • Improved runway facility for Florida’s Fort Lauderdale Airport
    August 18, 2015
    Florida’s Fort Lauderdale- Hollywood International Airport (FLL) is now benefiting from an upgraded runway. A key portion of the work has been carried out using equipment from Minnich. The airport handles about 23 million passengers/year and with about 3 million of those from international flights, there was a need to develop the facility to cope with the larger aircraft used on international flights. The Broward County Aviation Department was responsible for the work and specified that the runway exp
  • Motorway upgrades for Galicia, including A-55
    May 27, 2024
    Oscar Puente, Spain's minister of transport and sustainable mobility, made the announcement, saying it will help the Trans-European Transport Network.