Skip to main content

New Holland machines help rebuild busy Italian airport

Italy’s Il Caravaggio International Airport handles close to 9 million passengers/year, making it the country’s fourth busiest. Originally called Bergamo Orio al Serio Airport, it is a popular facility for low cost airlines as it is close to Bergamo and just 40km from Milan, as well as being convenient for other destinations in Northern Italy.
August 18, 2014 Read time: 3 mins
The New Holland units have been equipped with machine control technology to help maximise productivity

Italy’s Il Caravaggio International Airport handles close to 9 million  passengers/year, making it the country’s fourth busiest. Originally called Bergamo Orio al Serio Airport, it is a popular facility for low cost airlines as it is close to Bergamo and just 40km from Milan, as well as being convenient for other destinations in Northern Italy. In view of the heavy demand the airport’s operator, SACBO, is investing in the facility so as to meet its long-term needs.

A key portion of the project has required resurfacing the entire 3km runway, which has required a three-week closure of the facility. Excavators and wheeled loaders from 5895 New Holland Construction have played an important role in the project, with 20 units in all working at the site.

The fleet includes New Holland’s top-of-the range E485C crawler excavators, as well as E385C, E265B, E245C and E215C crawler excavators, in addition to a number of mini excavators from the firm’s compact range. The machine fleet also includes a W190 wheeled loader and a W80 wheeled loader. This fleet has been augmented by additional units when required to carry out specific duties.

Performance and productivity have been crucial for the project, given the tight time constraints that have seen the units operating 24 hours/day for extended periods. The machines have been supplied by the  Maren-CMO, New Holland Construction dealership based in Curno, near Bergamo, to the contractors Vitali and Artifoni. These well-known Italian contractors form part of the consortium that has been carrying out the runway resurfacing work.

 Vitali has already refurbished the runways at Milano Malpensa and Cuneo Levaldigi airports and has carried out an array of operations at Orio al Serio. These works have included breaking up the old runway, replacing the runway lighting, cabling and water drainage system, paving of the new runway and installing its markings.

To maximise productivity, accuracy and uptime the contractor has used the New Holland equipment fitted with sophisticated machine control technologies, as well as the firm’s advanced telematics systems.

Meanwhile Artifoni  is a specialised company that carries out large-scale wastewater and drainage systems, hydraulic works, and surface paving. The company is a long-standing customer for New Holland Construction with a fleet of 27 units from this supplier. For this airport project, Artifoni has handled the civil works for the new runway, including hydraulic works and cable duct installations. The company also carried out excavation and demolition operations, as well as preparing the new runway’s sub-base.

The New Holland excavators working at the Orio al Serio airport were supplied by Maren-CMO, fully equipped units with equipment including hydraulic hammers and circuits for grabs and bucket crushers.

For more information on companies in this article

Related Content

  • Webuild to start on Pedemontana Lombarda
    December 15, 2022
    The new sections of the Pedemontana Lombarda motorway near Milan in northern Italy will deploy smart technology to help with maintenance of the infrastructure and traffic control.
  • Concrete runway surface for Indonesian airport
    May 14, 2020
    The new Yogyakarta International Airport in Indonesia is seeing the benefit of a high-quality runway surface. The runway was built quickly and efficiently to a high standard, using the latest equipment. In all, 11 slipform pavers from Wirtgen played a key role in the airport’s construction.
  • Mobile plant provides asphalt answer at airport
    September 30, 2013
    The project to upgrade Kassel-Calden Airport in Germany is providing a much improved facility. Opened in 1970, the original airport had a short runway that was not suited to predicted traffic volumes and current standards so a complete reconstruction of the facility has been carried out. The €271 million investment in the facility is expected by the developers to provide a strong economic benefit to the area. The original airport was built on an area of over 200ha and a new and longer runway has been con
  • Mallorca Airport upgrade completed
    September 21, 2021
    Palma de Mallorca Airport (PMI) reopened its northern runway (06L-24R) at the end of 2020, after completing the surface refurbishment work