Skip to main content

New Holland machines help rebuild busy Italian airport

Italy’s Il Caravaggio International Airport handles close to 9 million passengers/year, making it the country’s fourth busiest. Originally called Bergamo Orio al Serio Airport, it is a popular facility for low cost airlines as it is close to Bergamo and just 40km from Milan, as well as being convenient for other destinations in Northern Italy.
August 18, 2014 Read time: 3 mins
The New Holland units have been equipped with machine control technology to help maximise productivity

Italy’s Il Caravaggio International Airport handles close to 9 million  passengers/year, making it the country’s fourth busiest. Originally called Bergamo Orio al Serio Airport, it is a popular facility for low cost airlines as it is close to Bergamo and just 40km from Milan, as well as being convenient for other destinations in Northern Italy. In view of the heavy demand the airport’s operator, SACBO, is investing in the facility so as to meet its long-term needs.

A key portion of the project has required resurfacing the entire 3km runway, which has required a three-week closure of the facility. Excavators and wheeled loaders from 5895 New Holland Construction have played an important role in the project, with 20 units in all working at the site.

The fleet includes New Holland’s top-of-the range E485C crawler excavators, as well as E385C, E265B, E245C and E215C crawler excavators, in addition to a number of mini excavators from the firm’s compact range. The machine fleet also includes a W190 wheeled loader and a W80 wheeled loader. This fleet has been augmented by additional units when required to carry out specific duties.

Performance and productivity have been crucial for the project, given the tight time constraints that have seen the units operating 24 hours/day for extended periods. The machines have been supplied by the  Maren-CMO, New Holland Construction dealership based in Curno, near Bergamo, to the contractors Vitali and Artifoni. These well-known Italian contractors form part of the consortium that has been carrying out the runway resurfacing work.

 Vitali has already refurbished the runways at Milano Malpensa and Cuneo Levaldigi airports and has carried out an array of operations at Orio al Serio. These works have included breaking up the old runway, replacing the runway lighting, cabling and water drainage system, paving of the new runway and installing its markings.

To maximise productivity, accuracy and uptime the contractor has used the New Holland equipment fitted with sophisticated machine control technologies, as well as the firm’s advanced telematics systems.

Meanwhile Artifoni  is a specialised company that carries out large-scale wastewater and drainage systems, hydraulic works, and surface paving. The company is a long-standing customer for New Holland Construction with a fleet of 27 units from this supplier. For this airport project, Artifoni has handled the civil works for the new runway, including hydraulic works and cable duct installations. The company also carried out excavation and demolition operations, as well as preparing the new runway’s sub-base.

The New Holland excavators working at the Orio al Serio airport were supplied by Maren-CMO, fully equipped units with equipment including hydraulic hammers and circuits for grabs and bucket crushers.

For more information on companies in this article

Related Content

  • Dubai infrastructure development
    March 24, 2017
    New infrastructure is being built in Dubai with the help of machines from Volvo CE The Dubai Water Canal is being built in a busy and congested urban area, with the project including construction of major new road bridge crossings. The work is being carried out by Turkish infrastructure specialist DETECH Contracting. The 3.2km waterway is being built through downtown Dubai and is among the most ambitious projects being carried out in the country. When fully opened in 2017 the project – called The Duba
  • Volvo CE excavators at high altitude in Georgia
    September 4, 2019
    The machines have been used at high altitude, yet have delivered high utilisation despite the tough working conditions.
  • Hitachi helps to build a better Stockholm
    November 19, 2024
    The ZE135 electric excavator has been put to the test on a high-profile development in the Stockholm Green Innovation District. This new growth area for technology and sustainability is being developed with the goal of renewing and building urban spaces with climate-smart solutions.
  • Finnish airport paving contract
    October 12, 2012
    The Finnish contractor Lemminkäinen is currently working on a paving contract for Finavia, the company which maintains Finland's airports. The contract includes paving milling, as well as paving work for runway 3 and taxiways at Helsinki- Vantaa airport. Lemminkäinen began its operations on the €20 million paving contract in April 2012 and the work is expected to end in the autumn of 2014. Helsinki-Vantaa Airport is an important traffic hub for Finland, as well as for the region, with around 15 million pass