Skip to main content

Meeting Middle Eastern demand

Although construction projects in Dubai and Abu Dhabi demand large volumes of aggregates, many quarries in those regions are being closed by authorities. Much of the demand is being met by quarries in the Emirate of Fujairah which are fast becoming the regions' 'bread basket' for gabbro aggregates.
February 13, 2012 Read time: 2 mins
Technical Drilling and Blasting now uses Sandvik top hammer rock tools across its whole drill rig fleet
Although construction projects in Dubai and Abu Dhabi demand large volumes of aggregates, many quarries in those regions are being closed by authorities. Much of the demand is being met by quarries in the Emirate of Fujairah which are fast becoming the regions' 'bread basket' for gabbro aggregates.

Meeting this demand is a challenge for these quarries and contract drilling and blasting teams are proving essential, as is investment in productivity-enhancing technology. Fujairah-based Technical Drilling and Blasting Company is one of the contractors gaining from this demand and has just standardised its operations to improve its productivity.

Despite the economic slowdown, the contractor reports that demand for drilling and blasting services remains high and it is one of five organisations operating in Fujairah. The company attributes the demand to the quality of the gabbro in the region with a typical density of 3tonnes per m³ and a 61% silica content. The Technical Drilling and Blasting Company has said that there is currently an almost continuous stream of trucks carrying aggregates travelling over the Hajjar Mountains from Fujairah to other UAE regions.

To help meet this high demand, the company now uses Sandvik top hammer rock tools across all of its operations, which includes contracts for around 24 quarries in Fujairah. Technical Drilling and Blasting Company technical manager Bill Armstrong said that the company has a fleet of 16 surface top hammer drills and two down the hole rigs, of which nine are 325 Sandvik units. "These are proving ideal in development and difficult to access areas of the quarry," he said.

For more information on companies in this article

Related Content

  • Breaking with Indeco hammers
    April 16, 2018
    Contractor New Hampshire Rock Reduction is using hydraulic hammers from Indeco for rock breaking and excavation duties. The firm says that it selected these units so as to optimise productivity and has used the breakers in quarrying as well as site development applications. Located in the northeast corner of the US, New Hampshire is one of the country’s smallest states. Noted for a rocky terrain, New Hampshire’s geology includes a heavy presence of metamorphic, especially igneous, rock formations, which yi
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • Concrete paving meets demanding airport conditions
    July 11, 2012
    High speed, high quality concrete paving can be achieved in the demanding airport environment using the latest equipment. Minnich Manufacturing has developed a novel dowel pin drilling machine and has successfully tested this equipment at Tyndall Air Force Base in Panama City, Florida. The A-5SCW is a self-propelled, cantilevered machine that features a wireless remote control and is designed to install five dowel pins simultaneously. The control system has been developed by Wisconsin Kar-Tech and uses prov
  • High quality Swedish stone
    February 10, 2012
    Close to Sweden's second largest city Göthenburg lies the efficient Jehander quarrying operation run by Heidelberg Cement. The site produces around 9,000tonnes/day at peak seasonal demand and has an output of some 1,000,000tonnes/year. The site has recently renewed its operating permission and now has the necessary approval to work until 2021.