Skip to main content

Meeting Middle Eastern demand

Although construction projects in Dubai and Abu Dhabi demand large volumes of aggregates, many quarries in those regions are being closed by authorities. Much of the demand is being met by quarries in the Emirate of Fujairah which are fast becoming the regions' 'bread basket' for gabbro aggregates. Meeting this demand is a challenge for these quarries and contract drilling and blasting teams are proving essential, as is investment in productivity-enhancing technology. Fujairah-based Technical Drilling and
April 12, 2012 Read time: 2 mins
Technical Drilling and Blasting now uses Sandvik top hammer rock tools across its whole drill rig fleet
RSS

Although construction projects in Dubai and Abu Dhabi demand large volumes of aggregates, many quarries in those regions are being closed by authorities. Much of the demand is being met by quarries in the Emirate of Fujairah which are fast becoming the regions' 'bread basket' for gabbro aggregates.


Meeting this demand is a challenge for these quarries and contract drilling and blasting teams are proving essential, as is investment in productivity-enhancing technology. Fujairah-based Technical Drilling and Blasting Company is one of the contractors gaining from this demand and has just standardised its operations to improve its productivity.

Despite the economic slowdown, the contractor reports that demand for drilling and blasting services remains high and it is one of five organisations operating in Fujairah. The company attributes the demand to the quality of the gabbro in the region with a typical density of 3tonnes per m³ and a 61% silica content. The Technical Drilling and Blasting Company has said that there is currently an almost continuous stream of trucks carrying aggregates travelling over the Hajjar Mountains from Fujairah to other UAE regions.

To help meet this high demand, the company now uses 325 Sandvik top hammer rock tools across all of its operations, which includes contracts for around 24 quarries in Fujairah. Technical Drilling and Blasting Company technical manager Bill Armstrong said that the company has a fleet of 16 surface top hammer drills and two down the hole rigs, of which nine are Sandvik units. "These are proving ideal in development and difficult to access areas of the quarry," he said.RSS

For more information on companies in this article

Related Content

  • Intermat’s Middle Eastern opportunity
    April 17, 2012
    More than 200 companies are preparing to take part in INTERMAT Middle East being held at the Abu Dhabi National Exhibition Centre from October 8-10 2012. Guy Woodford spoke to the ambassador of the UAE to France and senior figures in three exhibiting companies about the significance of the event and what they are looking to achieve through it.
  • Caterpillar drill performing in US quarry
    May 11, 2015
    A Caterpillar top hammer rig is said to be working well in a tough granite quarry operation in the US. The MD5150C rig is out-performing down-the-hole (DTH) rigs, with higher productivity and lower fuel consumption. Of note though is the fact that the machine is also delivering comparable hole straightness to the DTH machines. Iron Mountain Quarry is located to the south of St Louis, Missouri and the operation says that overall productivity from its Cat rig is almost double that of the earlier gener
  • Sandvik’s Korean roots
    June 14, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.
  • Sandvik’s Korean roots
    June 13, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.