Skip to main content

Mali’s international airport sees improvement

A three-year modernisation programme at Bamako-Sénou international airport will improve the facility and allow larger aircraft and greater passenger numbers. The Malian Government has been undertaking a vast extension of the airport with the aim of being able to accommodate over a million passengers/year and all sizes of passenger aircraft. The project is being handled by MCA-Mali, a consortium led by RAZEL-BEC and also including the Vinci Group, which is active in Mali. Guillaume Derousseau, constructio
August 21, 2013 Read time: 2 mins
The MCA-Mali consortium comprising RAZEL-BEC and Vinci carried out the airport upgrade using an array of asphalt production and road machines from the Fayat Group

A three-year modernisation programme at Bamako-Sénou international airport will improve the facility and allow larger aircraft and greater passenger numbers. The Malian Government has been undertaking a vast extension of the airport with the aim of being able to accommodate over a million passengers/year and all sizes of passenger aircraft.

The project is being handled by MCA-Mali, a consortium led by 2747 Razel-BEC and also including the 2498 VINCI Group, which is active in Mali. Guillaume Derousseau, construction manager for MCA-Mali said, “The first construction phase, mainly earthworks, consisting of extending the existing runway by 500m, was completed in January 2012. Then began the reinforcement of the runways and car parks, which required meticulous phasing to limit the project’s impact on flight operations, as the airport had to continue operating throughout the works. This phasing revolved around thirteen runway closures of 30-72 hours: periods during which the airport was closed and when our teams performed continuous planing and asphalt-laying operations.”

In all some 70,000 tonnes of asphalt were laid on the runway, taxiway and car parks. For this short-term project (one year), the client required a very large equipment fleet, with reserve units for nearly all machines to cope with potential breakdowns. Numerous machines bearing the brand names of the Fayat Road Building Equipment Division were used with asphalt production handled by two 211 Ermont TSM 15 and 17 parallel-flow continuous asphalt plants, and one Ermont emulsion plant. All of RAZEL Africa’s different skills were put to work on this project carried out by personnel of 11 different nationalities.

2779 Fayat Group machines from 172 Bomag also carried out the preparation, paving and compaction work. Surface preparation was handled by a BM 1000 milling machine, with paving carried out by four BF600s. The compaction duties were handled by three BW202 heavy tandem rollers and one BW 61 combination roller, as well as a BW219 single-drum roller. To ensure the freshly prepared asphalt surfaces were clean from any debris that could cause costly damage to an aircraft engine, a SCARAB Major 7001 vacuum sweeper was also employed.

For more information on companies in this article

Related Content

  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Meeting the challenge of desert runway resurfacing
    February 8, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications.