Skip to main content

Hydraulic breakers key to Hyderabad road project

The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
May 8, 2012 Read time: 2 mins
Ramky Infrastructure's Atlas Copco MB 1700 hydraulic breaker at a quarry site near the new road

The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city.

It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority.

Indian contractor 1236 RAMKY Infrastructure is relying on an 161 Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road.

The rock is being used as aggregate for the 22km stretch of the highway that Ramky Infrastructure is building. The company is part of the Ramky Group, which also formed Ramky Elsamex Hyderabad Ring Road in 2007 to build and operate parts of the ORR on a buildoperate- transfer basis.

For construction its section of the ORR, Ramky is currently building between Shamshabad and Gachibowli, it has deployed two 200tonnes/hour stone crushers at the site.

Mr T Haribabu, head of transportation for Ramky on this section of the ORR, says that controlled blasting is being used to excavate the rock, with small amounts of explosives being used to avoid possible cracking of buildings in nearby residential areas.

Rock is broken into fragments between 1.5-1.8m in size, and these are trucked to the breaking area where the MB 1700 is working in a static position, mounted on an L&T 2300 Komatsu PC 200 20tonne hydraulic excavator.

The 1,700kg hydraulic MB 1700 breaker is designed to work on excavators in the 19-32 tonne range, and on Ramky's section of the ORR it is being used to break the rock into pieces of between 500-600mm. These are then loaded into dump trucks and conveyed to the site, where they are fed directly into the crushers.

Ramky moved onto the site late in 2009 and is scheduled to complete the section of highway in November 2012.

For more information on companies in this article

Related Content

  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini
  • High quality Swedish stone
    April 13, 2012
    Close to Sweden's second largest city Göthenburg lies the efficient Jehander quarrying operation run by Heidelberg Cement. The site produces around 9,000tonnes/day at peak seasonal demand and has an output of some 1,000,000tonnes/year. The site has recently renewed its operating permission and now has the necessary approval to work until 2021. Niklas Osvaldsson is regional manager for Heidelberg Cement and said, "Since early 2000 this has been part of the Heidelberg Group." Stone production originally st
  • DSS Group invests in Hitachi ZX670LC-5 excavator
    August 23, 2013
    One of Poland’s largest aggregates producers, DSS Group, has purchased a new Hitachi ZX670LC-5 for its quarry at Pilawa Górna in Lower Silesia. The company took delivery of the Zaxis-5 large excavator from Polish Hitachi dealer Tona in January 2013 as a key part of its strategy for aggregates production at the site. The DSS Group – owned by Dolnolskie Surowce Skalne SA – is the largest domestic producer of crushed aggregates for infrastructure projects. It has a 30-year licence to extract amphibolite (a
  • Booming Chinese aggregate demand
    February 22, 2013
    Global demand for construction aggregates is set to increase 5.2% a year until 2015 to 48.3 billion tonnes, according to research by The Freedonia Group in the United States. The same source tips China alone to account for half of all new aggregate demand worldwide in the period 2010-2015. Guy Woodford reports on the growing importance of the Asian aggregates market. China is already the biggest nation for aggregate production and use in the world, and the competition among the giants of aggregate productio