Skip to main content

Hydraulic breakers key to Hyderabad road project

The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
May 8, 2012 Read time: 2 mins
Ramky Infrastructure's Atlas Copco MB 1700 hydraulic breaker at a quarry site near the new road

The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city.

It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority.

Indian contractor 1236 RAMKY Infrastructure is relying on an 161 Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road.

The rock is being used as aggregate for the 22km stretch of the highway that Ramky Infrastructure is building. The company is part of the Ramky Group, which also formed Ramky Elsamex Hyderabad Ring Road in 2007 to build and operate parts of the ORR on a buildoperate- transfer basis.

For construction its section of the ORR, Ramky is currently building between Shamshabad and Gachibowli, it has deployed two 200tonnes/hour stone crushers at the site.

Mr T Haribabu, head of transportation for Ramky on this section of the ORR, says that controlled blasting is being used to excavate the rock, with small amounts of explosives being used to avoid possible cracking of buildings in nearby residential areas.

Rock is broken into fragments between 1.5-1.8m in size, and these are trucked to the breaking area where the MB 1700 is working in a static position, mounted on an L&T 2300 Komatsu PC 200 20tonne hydraulic excavator.

The 1,700kg hydraulic MB 1700 breaker is designed to work on excavators in the 19-32 tonne range, and on Ramky's section of the ORR it is being used to break the rock into pieces of between 500-600mm. These are then loaded into dump trucks and conveyed to the site, where they are fed directly into the crushers.

Ramky moved onto the site late in 2009 and is scheduled to complete the section of highway in November 2012.

For more information on companies in this article

Related Content

  • New Doha highway under construction
    March 18, 2016
    Construction is now underway on the New Orbital Highway in Doha, Qatar. This project is called The New Orbital Highway contract 2 and is one of the largest projects being delivered through the Qatar’s public work authority Ashghal. The work consists of the design and construction of 47km of highway with a five-lane dual carriageway for light vehicles and two truck lanes in each direction. It also includes six viaducts, 17 bridges and underpasses and a 320m cut-and-cover tunnel. This last is particularly
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi