Skip to main content

Effective dust control

Dealing with nuisance dust is an issue for almost every quarry and for those operating in the tropical paradise of the Caribbean, it is no different. One Trinidad-based quarry operator has recently tackled the problem and is seeing benefits for its workers, neighbours and its machine service life too.
February 13, 2012 Read time: 3 mins
The fine water mist from the DustBoss helps to capture airborne particles
Dealing with nuisance dust is an issue for almost every quarry and for those operating in the tropical paradise of the Caribbean, it is no different. One Trinidad-based quarry operator has recently tackled the problem and is seeing benefits for its workers, neighbours and its machine service life too.

1416 Trinidad Cement Limited (TCL) extracts around 1.1million tonnes of limestone each year from its quarry in Mayo, Central Trinidad but had a history of problems with dust.

"In the past, our crews had done their best to control dust particles by hand spraying, but we found that watering with hoses or sprinklers offered limited benefit in containing surface dust," said TCL health, safety and environmental manager Amarchandra Maharaj. "And once the dust particles became airborne, the water droplets from these methods were far too large to have a meaningful effect." According to Maharaj, manual techniques also had a tendency to saturate the material surface and contributed to standing water. Even with dust screens and vegetation to help create a containment barrier, company officials believed there had to be a way to better suppress airborne particles and contain surface dust, without the saturation problems and manpower requirements that typically accompany hand spraying.

A study of the site showed that one of the main problem was the 229 Hazemag impactor mobile crusher that is used to process the limestone that is ripped using a 178 Caterpillar D11R.

The company wanted a solution that could be moved with the crusher and trialled a DustBoss DB-60 system from 2594 Dust Control Technologies (DCT) at the site with good results.

The system used at TCL's quarry delivers 850m³ of airflow through the barrel to give a throw of more than 60m and also had the option for a pump booster to increase the water pressure, if needed. The DB-60 also has an adjustable elevation from 0-50°, and the oscillating head delivers 40° of motion. The rotating design can cover 0.2ha from a single location and the wheeled carriage-mounted mobile unit can be easily relocated.

According to TCL, the system is working well and has helped to improve the working environment of its operative and minimise dust pollution problems for nearby residents. But the system is also having other operational advantages - it is helping to reduce the opportunity for abrasive dust to enter air intakes on heavy equipment, helping to extend air filter life and reduce unnecessary engine wear.

For more information on companies in this article

Related Content

  • Drilling's novel solutions
    July 23, 2012
    In the drilling and hydraulic attachment sectors too, firms are offering novel solutions for the customer. Atlas Copco continues to develop its comprehensive range of drilling solutions in the shape of its latest down-the-hole (DTH) and SmartRig variants, as well as adding new compact rigs and new consumables to the line-up. The firm's latest Roc L630 DTH rig benefits from a new feed as well as improved cooling. The new aluminium feed is said to improve hole straightness and hole quality. It also allows the
  • Concrete mixing technology offers advanced recipes
    February 13, 2012
    Modern concrete production plants are using technology to offer more sophisticated mix recipes as Patrick Smith reports. The growing trend towards ever more sophisticated concrete recipes calls for fully developed mixing technology. Companies are responding to the challenges with equipment that offers new levels of sophistication including computer controls and units that can deliver a huge variety of mix recipes.
  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at
  • Urban resurfacing on tracks with Caterpillar Paving
    July 9, 2024
    A UK contractor is making good use of its latest Caterpillar’s Cat Mobil-Trac paver for urban resurfacing works – Mike Woof reports