Skip to main content

Developing India’s roads with new machines

As part of the government’s plans to accelerate economic growth, a major expansion of India’s road network is underway Many cities in India are set to benefit from the government’s ambitious plan to use infrastructure investment to boost the economy. There are currently 11 ongoing projects across India’s road network, funded by the World Bank. Once complete, the road network will make travelling more efficient and boost India’s economic activity. The initiative will see the construction of new major
February 10, 2017 Read time: 3 mins
Volvo CE excavators are playing a key role in building a new road in India
As part of the government’s plans to accelerate economic growth, a major expansion of India’s road network is underway

Many cities in India are set to benefit from the government’s ambitious plan to use infrastructure investment to boost the economy. There are currently 11 ongoing projects across India’s road network, funded by the World Bank. Once complete, the road network will make travelling more efficient and boost India’s economic activity.

The initiative will see the construction of new major roads and upgrading of existing roads, with the government’s plan to increase the pace of road construction from 2km/day at present to 30km/day. The country’s road and transport ministry has set up a review committee that meets every month to take stock of progress. But to meet this target, construction companies are under pressure to boost productivity.

Contractor Bharat Vanijya is using a fleet of Volvo machines to work on an 84km stretch of road from Bankura to Purulia. This is just one such project in the state of West Bengal in eastern India, and extends across two disadvantaged districts. With connectivity being a basic tool of development, projects such as these have a socio-economic impact and are designed to foster a successful economic and business environment.  

Machines from 359 Volvo CE are playing an important role in helping build one major highway project. The fleet in question includes 29 Volvo units, operating daily for up to 15 hours at a time. The project, which began in September 2015, involves the expansion of the two-lane road from 5.5m to up to 10m wide. The existing road includes seven major bridges and approximately 84 small cross-drainage structures.

Responding to the pressure from the government, Gokul Agarwar, director of contractor Bharat Vanijya, is confident that his firm will get the job within the 30-month schedule.
The company presently has 16 EC210B 20tonne-class crawler excavators, seven SD110 single drum soil compactors and three 10tonne DD100 double drum asphalt compactors, combined with a PTR220 pneumatic tyre roller, a P4370B ABG wheeled paver and a P5320 tracked paver. In addition, the firm has an HB22 hydraulic rock breaker, which is being used with the EC210B excavators.

Because the machines are proving reliable and productive, Agarwar even thinks his firm can deliver the project early and within a 22-month timeframe, rather than the original 30-month schedule that was expected. This is based on previous experience as Bharat Vanijya has already completed three major projects in the same district in less than half the time allocated.

This high productivity is a key target for the company. “Early completion of a project allows us to go ahead with another project, while improving company turnover and sales figures,” said Agarwal. Completing eight months ahead of schedule will also boost the company’s reputation, helping it to win further contract tenders in the future. The high productivity has benefited the bottom line and Agarwal estimated that the firm almost doubled its original target set at the beginning of March 2016.

The firm has used numerous competing brands on various worksites but Agarwal said he is is finding the Volvo CE machines productive, reliable and also cost-effective in terms of depreciation, capital outlay, investment and maintenance.

To help keep operating costs low, Agarwal said that the Volvo machines are  being well maintained and are continuing to run smoothly, in spite of the long hours and often very high working temperatures encountered on site.

Related Content

  • Volvo excavators are DNA of India’s SVA
    March 28, 2014
    Indian extraction company SVA Blue Metals is producing millions of tonnes of aggregates/year, using a fleet of Volvo excavators SVA Blue Metals was founded three decades ago by the father of present owner R Ramakrishnan, who handed the business over to his son 15 years ago. The company runs a facility in Karanampettai village close to the bustling industrial city of Coimbatore, around 471km from Chennai, the capital of Tamil Nadu state, and has a license to extract from a portion of the site – with a view
  • Volvo CE bridging the gap for new Indian transport links
    December 11, 2013
    The old Pakuria Bridge in Jharkhand, India, ran over a dry riverbed and railway line situated 20km from Calcutta. Now obsolete, the bridge has been brought to the ground in 60 days using Volvo construction equipment West Bengal in eastern India is the nation’s fourth most populous region, boasting more people than the whole of Germany. The state is bordered by Nepal, Bhutan, Bangladesh, and five other states of India with more than 91 million inhabitants spread over 34,267m².
  • Volvo CE machines in Indonesia quarry
    November 20, 2015
    The operation is now using one of the EC220DL excavator models, which has helped boost productivity by some 30%. In addition, the machine is said to be delivering savings in running costs at the Alam Jaya volcanic rock quarry, through reducing fuel consumption by two litres/hour. The site is located close to West Java’s capital city, Bandung, at the foot of the volcano, Tangkuban Perahu. The city is home to 2.5 million people and sits at 768m above sea level, while it benefits from one of Indonesia’s coo
  • Improvements to China's first desert expressway
    April 4, 2013
    The latest asphalt paving technology is now available and being utilised in novel ways to build and improve roads, often in challenging applications. Tough working environments, strict project deadlines and precise quality requirements are all posing engineering challenges for road construction projects around the world. For a number of asphalt paving applications, novel approaches and new technology are being employed to deliver projects on time and within specifications. In China, improvements to the coun