Skip to main content

Building an airport for St Helena

The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
August 29, 2013 Read time: 3 mins
A fleet of Volvo ADTs is being used to carry out the haulage operation for St Helena’s airport project

The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa.

The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the island’s only regular transport link is through RMS St Helena, an old 4872 Royal Mail vessel that makes the trip from South Africa once every three weeks.

The project’s client is St Helena’s Government and the work is being funded by the UK’s 3915 Department for International Development (DfID) with the two phases of the project valued at US$371 million. The airport is being constructed on an arid part of the island, the Prosperous Plain, on the north-eastern coast. Phase One will see the construction of the airport and supporting infrastructure, including a 14km-long connecting road to the capital of Jamestown. Phase Two will see the operation of the airport for a period of 10 years, commencing in February 2016.

Construction firm Basil Read is carrying out the work and began by building a temporary rock and concrete jetty in Rupert’s Bay on the North of the island, with mooring points positioned in the bay to allow materials to be off-loaded. The jetty is capable of accommodating the NP Glory 4, Basil Read’s chartered 1,530tonne, the first ocean-going vessel ever to voluntarily touch the island.
The first machine to drive onto St Helena was a Volvo G940B grader followed by Volvo’s 70tonne EC700C excavator and several Volvo articulated haulers, including both the new F-Series A40Fs and an A30E. This fleet joined smaller machines including an EW140C excavator, a BL61B backhoe loader and a DD24 compactor, which had been delivered earlier on the RMS St Helena for preparation work.

Construction workers are carried on the RMS St Helena from Cape Town, a five-day voyage. The contractor moves equipment and materials from Walvis Bay in Namibia on the chartered vessel, an 80m long ocean-going landing-craft fitted with a 40tonne derrick crane and modified to carry one million litres of fuel, plus 1,000tonnes of cargo.

Once complete the concrete runway will be 1,950m long and the terminal building, air traffic tower and fire station will cover an area of some 2,500m2. The contractor is now using four EC700DL excavators, 20 A40F haulers, four A30E hauler-based container carriers, two G940 graders, six A30Es converted to water trucks, two A30E haulers, an EC360B excavator with breaker, a EW140C excavator, four SD200X compactors, a L120F loader and an EC290 excavator.
Each team is using a 70tonne excavator and five 40tonne haulers plus ancillary machines such as graders, dozers and water trucks. At peak times, the teams work six days a week.

Prior to the main equipment being delivered, 359 Volvo CE’s independent South African dealer, Babcock, had service personnel, technicians and parts personnel already in place on the island. Volvo is backing up this team with a technical supervisor for the project. A second delivery by the freighter NP Glory 4

landed a further 15 Volvo A40F articulated haulers, three additional Volvo EC700C excavators and three SD200DX single drum soil compactors.

For more information on companies in this article

Related Content

  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.
  • A thousand birthday greetings for US-Canada Thousand Island Bridge
    August 21, 2018
    The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
  • More Singapore work for Penta-Ocean and Bachy Soletanche
    August 6, 2018
    Singapore’s Land Transport Authority has awarded a design-build contract for a stretch of the North-South Corridor to Japanese firm Penta-Ocean Construction and Bachy Soletanche Singapore. Construction on the 1km tunnel between Suffolk Walk and Novena Rise, estimated to be worth around US$584 million, will start by the first quarter of 2019, according to a statement by the Authority. Works by the joint venture will include an underground pedestrian network, pedestrian overhead bridges, bus stops, shel
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l