Skip to main content

Yotta DCL wins prized M40 UK surveying contract

Highway’s technology and surveying company Yotta DCL has won a contract to provide surveys for Carillion on the M40 between southern England and the West Midlands worth €433,641 (£375,000). Yotta DCL were awarded the five-year contract after being shortlisted through an e-auction, which sees vetted survey providers bid against each other for the survey work. Carillion holds the Operation and Maintenance agreement with UK Highways, which is the M40 DBFO (design, build, finance and operate) company. Yotta DC
August 7, 2013 Read time: 3 mins
Yotta DCL has won a key contract to provide surveys for Carillion on the M40 in central England
Highway’s technology and surveying company 5153 Yotta DCL has won a contract to provide surveys for 2435 Carillion on the M40 between southern England and the West Midlands worth €433,641 (£375,000).

Yotta DCL were awarded the five-year contract after being shortlisted through an e-auction, which sees vetted survey providers bid against each other for the survey work. Carillion holds the Operation and Maintenance agreement with UK Highways, which is the M40 DBFO (design, build, finance and operate) company.

Yotta DCL will provide Carillion with Deflectograph, CHART, High Speed Road Monitor (HRM) and Skid Resistance surveys and resulting quality data. The company will survey 350km of carriageway, including slip roads, running between Junction 1 and Junction 15 of the M40.  

“To give us surety of service delivery, we took the decision to offer a five-year contract instead of the usual annual procurement. We are pleased that Yotta DCL won the e-auction as the company has provided surveys for us in previous years. Being a DBFO, it is an unusual contract to award because it runs much longer and so it is good to be working with a company that we trust. We have an excellent relationship with the company and it delivers its surveys and data on time. In addition, Yotta DCL’s after care is very good,” said Graham Farr, asset manager at Carillion.  

The M40 DBFO is one of the most mature in the UK. It was established in 1997 and will run until 2027. UK Highways holds the concession for the M40 DBFO with Carillion being responsible for all operations and maintenance.  

Deflectograph is a vehicle-based survey that measures the deflection of the road surface under a known load. The survey assess the structural condition and provides a wide range of data to help assess the residual life of the carriageway together with detailed information that guides strengthening or reconstruction schemes. CHART is a walked survey that is performed simultaneously with the deflectograph; it picks up fine detail that may otherwise be missed by the survey vehicle.

Yotta DCL uses one of its bespoke survey vehicles to perform the HRM machine survey. The survey collects a range of information such as longitudinal profile, texture, transverse profile, and cracking. Cracking data is processed from high-resolution images of the surface taken by a line-scanning camera. Skidding resistance surveys play an important part in helping Carillion tackle safety and inform policies going forwards to reduce road traffic incidents.

The five-year contract ensures surety of service for Carillion. Yotta DCL were awarded the contract after being shortlisted based on experience and knowledge through an e-auction, which vetted survey providers bid against one another for the survey work.

For more information on companies in this article

Related Content

  • Action call for ''Britain's worn-our road markings''
    March 2, 2012
    Nearly a third of the length of Britain's single carriageway A roads have white lines so worn out that they do not meet recognised standards, according to the LifeLines Report, an assessment of more than 2,400km miles of the network.
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Vehicle tracking improves winter spreading safety
    March 2, 2012
    Aebi Schmidt UK and Masternaut Three X, one of the leading providers of vehicle tracking systems, have formed a partnership to improve safety on winter roads, save money and increase the efficiency of spreading fleets. The web-based Masternaut Three X satellite tracking system interfaces with the technology of Schmidt spreaders at levels to suit every highways authority, from tracking and reporting, through to the most detailed data on vehicle performance and fleet management. At the heart of the system is
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer