Skip to main content

Yotta DCL wins prized M40 UK surveying contract

Highway’s technology and surveying company Yotta DCL has won a contract to provide surveys for Carillion on the M40 between southern England and the West Midlands worth €433,641 (£375,000). Yotta DCL were awarded the five-year contract after being shortlisted through an e-auction, which sees vetted survey providers bid against each other for the survey work. Carillion holds the Operation and Maintenance agreement with UK Highways, which is the M40 DBFO (design, build, finance and operate) company. Yotta DC
August 7, 2013 Read time: 3 mins
Yotta DCL has won a key contract to provide surveys for Carillion on the M40 in central England
Highway’s technology and surveying company 5153 Yotta DCL has won a contract to provide surveys for 2435 Carillion on the M40 between southern England and the West Midlands worth €433,641 (£375,000).

Yotta DCL were awarded the five-year contract after being shortlisted through an e-auction, which sees vetted survey providers bid against each other for the survey work. Carillion holds the Operation and Maintenance agreement with UK Highways, which is the M40 DBFO (design, build, finance and operate) company.

Yotta DCL will provide Carillion with Deflectograph, CHART, High Speed Road Monitor (HRM) and Skid Resistance surveys and resulting quality data. The company will survey 350km of carriageway, including slip roads, running between Junction 1 and Junction 15 of the M40.  

“To give us surety of service delivery, we took the decision to offer a five-year contract instead of the usual annual procurement. We are pleased that Yotta DCL won the e-auction as the company has provided surveys for us in previous years. Being a DBFO, it is an unusual contract to award because it runs much longer and so it is good to be working with a company that we trust. We have an excellent relationship with the company and it delivers its surveys and data on time. In addition, Yotta DCL’s after care is very good,” said Graham Farr, asset manager at Carillion.  

The M40 DBFO is one of the most mature in the UK. It was established in 1997 and will run until 2027. UK Highways holds the concession for the M40 DBFO with Carillion being responsible for all operations and maintenance.  

Deflectograph is a vehicle-based survey that measures the deflection of the road surface under a known load. The survey assess the structural condition and provides a wide range of data to help assess the residual life of the carriageway together with detailed information that guides strengthening or reconstruction schemes. CHART is a walked survey that is performed simultaneously with the deflectograph; it picks up fine detail that may otherwise be missed by the survey vehicle.

Yotta DCL uses one of its bespoke survey vehicles to perform the HRM machine survey. The survey collects a range of information such as longitudinal profile, texture, transverse profile, and cracking. Cracking data is processed from high-resolution images of the surface taken by a line-scanning camera. Skidding resistance surveys play an important part in helping Carillion tackle safety and inform policies going forwards to reduce road traffic incidents.

The five-year contract ensures surety of service for Carillion. Yotta DCL were awarded the contract after being shortlisted based on experience and knowledge through an e-auction, which vetted survey providers bid against one another for the survey work.

For more information on companies in this article

Related Content

  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the
  • Bomag comes in first
    November 23, 2021
    Bomag equipment was essential for constructing the Mandalika circuit, according to R3, the project’s asphalt technical consultant.
  • Advanced grooving method for UK motorway
    June 10, 2015
    Balfour Beatty Mott MacDonald has used Klaruw’s advanced longitudinal grooving system, GrooveTex, to retexture sections of concrete surface on the M20 motorway in the county of Kent, UK. The GrooveTex system improves and restores surface skid resistance by creating micro longitudinal grooves using closely spaced diamond tipped saw blades at a predetermined width and depth. GrooveTex is based on the diamond grinding principle. GrooveTex adjusts to and follows the profile of the surface. The surface lev
  • M25 maintenance contract for Tarmac in UK
    May 25, 2017
    Contractor Tarmac has won a deal that will see the firm carrying out maintenance work on the UK’s M25 motorway. The contract is worth some £10 million/year and is for M25 operator and maintenance company, Connect Plus. The M25 motorway is one of the busiest road links in Europe and runs around UK capital London. The agreement will be for a period of up to 12 years and will see Tarmac carrying out resurfacing work for a total of 440km of motorway as well as the key link roads around London. Tarmac will also