Skip to main content

Yotta DCL wins prized M40 UK surveying contract

Highway’s technology and surveying company Yotta DCL has won a contract to provide surveys for Carillion on the M40 between southern England and the West Midlands worth €433,641 (£375,000). Yotta DCL were awarded the five-year contract after being shortlisted through an e-auction, which sees vetted survey providers bid against each other for the survey work. Carillion holds the Operation and Maintenance agreement with UK Highways, which is the M40 DBFO (design, build, finance and operate) company. Yotta DC
August 7, 2013 Read time: 3 mins
Yotta DCL has won a key contract to provide surveys for Carillion on the M40 in central England
Highway’s technology and surveying company 5153 Yotta DCL has won a contract to provide surveys for 2435 Carillion on the M40 between southern England and the West Midlands worth €433,641 (£375,000).

Yotta DCL were awarded the five-year contract after being shortlisted through an e-auction, which sees vetted survey providers bid against each other for the survey work. Carillion holds the Operation and Maintenance agreement with UK Highways, which is the M40 DBFO (design, build, finance and operate) company.

Yotta DCL will provide Carillion with Deflectograph, CHART, High Speed Road Monitor (HRM) and Skid Resistance surveys and resulting quality data. The company will survey 350km of carriageway, including slip roads, running between Junction 1 and Junction 15 of the M40.  

“To give us surety of service delivery, we took the decision to offer a five-year contract instead of the usual annual procurement. We are pleased that Yotta DCL won the e-auction as the company has provided surveys for us in previous years. Being a DBFO, it is an unusual contract to award because it runs much longer and so it is good to be working with a company that we trust. We have an excellent relationship with the company and it delivers its surveys and data on time. In addition, Yotta DCL’s after care is very good,” said Graham Farr, asset manager at Carillion.  

The M40 DBFO is one of the most mature in the UK. It was established in 1997 and will run until 2027. UK Highways holds the concession for the M40 DBFO with Carillion being responsible for all operations and maintenance.  

Deflectograph is a vehicle-based survey that measures the deflection of the road surface under a known load. The survey assess the structural condition and provides a wide range of data to help assess the residual life of the carriageway together with detailed information that guides strengthening or reconstruction schemes. CHART is a walked survey that is performed simultaneously with the deflectograph; it picks up fine detail that may otherwise be missed by the survey vehicle.

Yotta DCL uses one of its bespoke survey vehicles to perform the HRM machine survey. The survey collects a range of information such as longitudinal profile, texture, transverse profile, and cracking. Cracking data is processed from high-resolution images of the surface taken by a line-scanning camera. Skidding resistance surveys play an important part in helping Carillion tackle safety and inform policies going forwards to reduce road traffic incidents.

The five-year contract ensures surety of service for Carillion. Yotta DCL were awarded the contract after being shortlisted based on experience and knowledge through an e-auction, which vetted survey providers bid against one another for the survey work.

For more information on companies in this article

Related Content

  • TRL delivers its vision
    July 31, 2012
    The UK's world-renowned TRL (Transport Research Laboratory) is celebrating its 75th birthday this year, and the objective of its work has not changed In 1938 Richard Stradling, director, wrote that "the objective of all the research work at RRL [now TRL] is to accumulate that body of scientific knowledge which is an essential factor in the economical and efficient construction and maintenance of our roads. Practical application of the results must be the aim throughout." While TRL's remit today is far more
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • East Midlands repair deal for Aggregates Industries
    June 7, 2023
    Aggregates Industries has won a major repair deal for the East Midlands.