Skip to main content

Opening St Petersburg's key tollway ring road

A new section of Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the Hyundai plant in Kamenka, has been opened to traffic in St Petersburg. The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built. The US$7.23 billion WHSD Tollway in the city is sponsored by the Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the ci
May 15, 2012 Read time: 2 mins
A new section of 3639 Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the 236 Hyundai plant in Kamenka, has been opened to traffic in St Petersburg.

The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built.

The US$7.23 billion WHSD Tollway in the city is sponsored by the 2612 Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the city as a major world transport hub.

Scheduled for completion in 2015, the WHSD will also allow, together with the Ring Road, closure of the first transport ring around St Petersburg.

About 55% of the 46.6km long, mostly eight-lane, urban motorway will be elevated with 15 interchanges at different levels, and bridge structures with 55m and 35m clearances over the ship fairway will be the first structures of their type in Russia.

Meanwhile, discussions have been held regarding a section of the Moscow-St Petersburg highway, which was to have been built through the Khimkinsky Forest, part of the Russian capital’s green belt.

A final decision over the route of the highway has yet to be made, although the project is expected to cost over E700 million in all to complete.

For more information on companies in this article

Related Content

  • Finance change on Orlovski Tunnel
    July 9, 2012
    A change in financing arrangements has been announced by the local authorities in Russian city St Petersburg for the Orlovski Tunnel project. This move is being made due to changes in terms and costs for the project, which is for the construction of a new road tunnel under the city that is intended to alleviate congestion.
  • AVTODOR seeks another Moscow-St Petersburg motorway section bid
    December 18, 2014
    Russia's state highways agency AVTODOR has invited bids for construction of another section of the Moscow to St. Petersburg toll motorway. Starting cost of the bid to build the section from kilometre 58-149 is nearly US$1.2 billion. Investors will have to put up front 20% of the accepted bid cost to build the 91km section. Construction of the 700km motorway is being let in sections, with highly competitive bids coming from the major international players in highways infrastructure. In February 2014
  • Russian road plans
    May 2, 2012
    Plans are in hand for major upgrades to Russia’s road network. Russian Highways (Avtodor) aims to construct 958km of roads, as well as to reconstruct 963km of road and improve 700km of road bed by 2019. The 684km M11 highway linking Moscow with St Petersburg is the top-priority. A 72km bypass road will be built in the Tver region.
  • Russian road plans
    March 16, 2012
    Plans are in hand for major upgrades to Russia’s road network. Russian Highways (Avtodor) aims to construct 958km of roads, as well as to reconstruct 963km of road and improve 700km of road bed by 2019.