Skip to main content

New Hoover Bypass Bridge complete

Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
February 29, 2012 Read time: 1 min
RSSWork on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed. The bridge forms part of the Hoover Bypass, a project worth some US$240 million.

This new bypass route replaces the highly congested US Route 93, a two-lane road running along the top of the Hoover Dam itself. This route has been unable to cope with the increased volumes of traffic and long queues of vehicles have formed at peak periods, especially since the terrorist attacks on the US in 2001, due to the need for security checkpoints. Heavy trucks have also been forbidden from using the US95 link over the dam and have had to take alternative routes.

Related Content

  • Houston, Texas is seeing fast expansion of population, with in vast increases in traffic
    October 9, 2018
    The US city of Houston is expanding fast and its transport system is having to be developed to cope
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N