Skip to main content

New Hoover Bypass Bridge complete

Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
February 29, 2012 Read time: 1 min
RSSWork on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed. The bridge forms part of the Hoover Bypass, a project worth some US$240 million.

This new bypass route replaces the highly congested US Route 93, a two-lane road running along the top of the Hoover Dam itself. This route has been unable to cope with the increased volumes of traffic and long queues of vehicles have formed at peak periods, especially since the terrorist attacks on the US in 2001, due to the need for security checkpoints. Heavy trucks have also been forbidden from using the US95 link over the dam and have had to take alternative routes.

Related Content

  • New bridge connection from Nigeria to Cameroon
    August 18, 2015
    A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries.
  • Two key Australian highway links underway
    May 28, 2012
    Two key highway upgrades will be carried out in Australia by Valemus, a subsidiary of German construction firm Bilfinger Berger. In total the work is worth some US$219.4 million. Valemus is building a section of the Pacific Highway in New South Wales. This 8.6km four-lane road forms a bypass around Bulahdelah and is the final link in the southern section of this highway.
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Colorado express lanes opening
    November 29, 2021
    Express lanes are opening on I-25 in Colorado.