Skip to main content

Nepal's traffic improvements on track

Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas.
April 26, 2012 Read time: 1 min
2664 Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas. The work focussed on major intersections where traffic jams have affected the whole system. Kalimati, Tripureshwor, Thapathali, New Baneshwor and Old Baneshwor have been identified as the most congested areas where traffic congestion has to be improved. The studies are now complete and different options have been proposed for each intersection based upon the location. The Department of Roads is now consulting with the stakeholders along with the authorities. The Kathmandu Metropolitan City, 2437 Ministry of Physical Planning and Works, Transport Ministry, Traffic Police and the Transport Association are all involved in the consultation process. Construction of the improved intersections will be completed in 3-5 years with the aim of coping with traffic growth for the next 15 years. The Nepalese Government is also widening key roads in Kathmandu at present so as to address traffic congestion.

For more information on companies in this article

Related Content

  • Road transport key to Africa's trade links
    February 17, 2012
    Road transport is the key to improving Africa's links within its own territory, and further afield as Patrick Smith reports. Development of road transportation is the key to the future of the African economy, and countries on the continent are making great strides. According to a report by a transport infrastructure expert at the New Partnership for Africa's Development (NEPAD), within the next 15 years the value of trade in Africa could reach US$250 billion if a $32 billion investment is made to integrate
  • Nepal's road safety upgrade
    April 26, 2012
    The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
  • Atkins is working on a major traffic project in the US
    April 23, 2013
    Atkins North America is now working on a key traffic project in the US to head the 2013 Congestion Management Program (CMP) and Multimodal Transportation Service Objective (MTSO) Monitoring Effort. This is an important project costing some $225,000. As part of the CMP, the Authority is responsible for monitoring the achievement of Level-of-Service (LOS) Standards and performance standards established under the programme. These measures will compare the 2011 monitoring results with those from previous monito
  • PPRS: the positive side of structural failures
    March 27, 2018
    You learn from your failures, not your successes. That was the overall message for delegates during the day-two morning session on the impact of engineering structural failures. These lessons are also too often “painful”, said Anne-Marie Leclerq, deputy minister for infrastructure within the ministry of transport for the Canadian province of Quebec. On September 30, 2006, a span of the six-lane Concorde Bridge in Laval, near Montreal, collapsed crushing to death five people and injuring six. Only recently