Skip to main content

Nepal's traffic improvements on track

Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas.
April 26, 2012 Read time: 1 min
2664 Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas. The work focussed on major intersections where traffic jams have affected the whole system. Kalimati, Tripureshwor, Thapathali, New Baneshwor and Old Baneshwor have been identified as the most congested areas where traffic congestion has to be improved. The studies are now complete and different options have been proposed for each intersection based upon the location. The Department of Roads is now consulting with the stakeholders along with the authorities. The Kathmandu Metropolitan City, 2437 Ministry of Physical Planning and Works, Transport Ministry, Traffic Police and the Transport Association are all involved in the consultation process. Construction of the improved intersections will be completed in 3-5 years with the aim of coping with traffic growth for the next 15 years. The Nepalese Government is also widening key roads in Kathmandu at present so as to address traffic congestion.

For more information on companies in this article

Related Content

  • Optimising traffic control ensures efficient use of infrastructure
    April 10, 2013
    Central and local governments are facing many challenges, not least a shortage of funds due to budget restraints in the US and Europe in particular. In other markets, ensuring efficient traffic flow is the priority, with monitoring of network status being a key tool. New technology for traffic monitoring plays a crucial role and the sector is keen to introduce new and more efficient systems. The Transport Research laboratory (TRL) has long been a pioneer of traffic control technologies and its latest MAAPc
  • RBF Consulting selected for 'hot spots' feasibility analysis
    February 27, 2012
    RBF Consulting has been selected by the Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion 'Hot Spots' Feasibility Analysis.
  • Nepal road transport plan finds funding
    February 27, 2017
    Nepal’s Kathmandu-Tarai highway now looks likely to be built under an engineering, procurement and construction (EPC) contract. This is a revision from the build-own-operate-transfer (BOOT) model previously suggested. Nepal's Ministry of Physical Infrastructure and Transport has announced the change for the project, which had an estimated cost of US$1.04 billion when put forward in 2015. The detailed project report (DPR) for the highway is likely to be set out by consortium, from India. The Nepalese Governm